Time to import (days) in Senegal

Senegal: Time to import (days) was 14 DB06-15 methodology in 2014. ▼ Falling

Latest (2014)
14 DB06-15 methodology
Change on year
down 6.7%
World rank
119th
of 181 countries
All-time high
27 DB06-15 methodology
in 2005
All-time low
14 DB06-15 methodology
in 2014
Years of data
10
2005–2014

Time to import (days) in Senegal, 2005–2014

01020302005200920142005: 27 DB06-15 methodology2006: 27 DB06-15 methodology2007: 27 DB06-15 methodology2008: 19 DB06-15 methodology2009: 15 DB06-15 methodology2010: 15 DB06-15 methodology2011: 15 DB06-15 methodology2012: 15 DB06-15 methodology2013: 15 DB06-15 methodology2014: 14 DB06-15 methodology

Source: World Bank. Measured in DB06-15 methodology.

Analysis

Senegal recorded 14 DB06-15 methodology for time to import (days) in 2014. That is the lowest value across all 10 years on record.

Compared with earlier readings it is down 6.7% on the previous year and down 48.1% over ten years.

Over the whole period, time to import (days) in Senegal peaked at 27 DB06-15 methodology in 2005 and was at its lowest, 14 DB06-15 methodology, in 2014.

Senegal ranks 119th of 181 countries on this measure, in the middle of the range.

Averages by decade

DecadeAverage LowestHighest Years
2000s 23 DB06-15 methodology 15 DB06-15 methodology 27 DB06-15 methodology 5
2010s 14.8 DB06-15 methodology 14 DB06-15 methodology 15 DB06-15 methodology 5

Countries ranked near Senegal

  1. 119 Costa Rica 14 DB06-15 methodology compare
  2. 119 Croatia 14 DB06-15 methodology compare
  3. 119 Dominica 14 DB06-15 methodology compare
  4. 119 Greece 14 DB06-15 methodology compare
  5. 119 Montenegro 14 DB06-15 methodology compare
  6. 119 Morocco 14 DB06-15 methodology compare
  7. 119 Poland 14 DB06-15 methodology compare
  8. 119 Slovenia 14 DB06-15 methodology compare
  9. 119 Trinidad and Tobago 14 DB06-15 methodology compare
  10. 119 Turkey 14 DB06-15 methodology compare
  11. 119 Uruguay 14 DB06-15 methodology compare

See the full ranking of 183 places →

More reference data data for Senegal

All data for Senegal →

Frequently asked questions

What is time to import (days) in Senegal?
Time to import (days) in Senegal was 14 DB06-15 methodology in 2014, according to the World Bank.
What is the highest time to import (days) recorded in Senegal?
The highest recorded value was 27 DB06-15 methodology in 2005.
What is the lowest time to import (days) recorded in Senegal?
The lowest recorded value was 14 DB06-15 methodology in 2014.
How does Senegal rank for time to import (days)?
Senegal ranks 119th out of 181 countries with data for 2014.
Is time to import (days) rising or falling in Senegal?
Over the last ten years it is down 48.1%. The long-run trend across the full record is falling.
Where does this Senegal data come from?
The figures come from the World Bank, published as part of Time to import (days) (DB06-15 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 10 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Time to import (days) (DB06-15 methodology)
Unit
DB06-15 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The time to import records the time associated with importing a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calulcated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to certain accredited firms under authorized economic operator programs are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.