Time to import (days) in Montenegro

Montenegro: Time to import (days) was 14 DB06-15 methodology in 2014. ▬ Flat

Latest (2014)
14 DB06-15 methodology
Change on year
unchanged
World rank
119th
of 181 countries
All-time high
14 DB06-15 methodology
in 2006
All-time low
14 DB06-15 methodology
in 2006
Years of data
9
2006–2014

Time to import (days) in Montenegro, 2006–2014

0510152006201020142006: 14 DB06-15 methodology2007: 14 DB06-15 methodology2008: 14 DB06-15 methodology2009: 14 DB06-15 methodology2010: 14 DB06-15 methodology2011: 14 DB06-15 methodology2012: 14 DB06-15 methodology2013: 14 DB06-15 methodology2014: 14 DB06-15 methodology

Source: World Bank. Measured in DB06-15 methodology.

Analysis

Montenegro recorded 14 DB06-15 methodology for time to import (days) in 2014. That is the highest value across all 9 years on record.

Compared with earlier readings it is unchanged over ten years.

Over the whole period, time to import (days) in Montenegro peaked at 14 DB06-15 methodology in 2006 and was at its lowest, 14 DB06-15 methodology, in 2006.

That places Montenegro 119th out of 181 countries with data for 2014, putting it in the middle of the range.

Averages by decade

DecadeAverage LowestHighest Years
2000s 14 DB06-15 methodology 14 DB06-15 methodology 14 DB06-15 methodology 4
2010s 14 DB06-15 methodology 14 DB06-15 methodology 14 DB06-15 methodology 5

Countries ranked near Montenegro

  1. 119 Costa Rica 14 DB06-15 methodology compare
  2. 119 Croatia 14 DB06-15 methodology compare
  3. 119 Dominica 14 DB06-15 methodology compare
  4. 119 Greece 14 DB06-15 methodology compare
  5. 119 Morocco 14 DB06-15 methodology compare
  6. 119 Poland 14 DB06-15 methodology compare
  7. 119 Senegal 14 DB06-15 methodology compare
  8. 119 Slovenia 14 DB06-15 methodology compare
  9. 119 Trinidad and Tobago 14 DB06-15 methodology compare
  10. 119 Turkey 14 DB06-15 methodology compare
  11. 119 Uruguay 14 DB06-15 methodology compare

See the full ranking of 183 places →

More reference data data for Montenegro

All data for Montenegro →

Frequently asked questions

What is time to import (days) in Montenegro?
Time to import (days) in Montenegro was 14 DB06-15 methodology in 2014, according to the World Bank.
What is the highest time to import (days) recorded in Montenegro?
The highest recorded value was 14 DB06-15 methodology in 2006.
What is the lowest time to import (days) recorded in Montenegro?
The lowest recorded value was 14 DB06-15 methodology in 2006.
How does Montenegro rank for time to import (days)?
Montenegro ranks 119th out of 181 countries with data for 2014.
Is time to import (days) rising or falling in Montenegro?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Montenegro data come from?
The figures come from the World Bank, published as part of Time to import (days) (DB06-15 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 9 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Time to import (days) (DB06-15 methodology)
Unit
DB06-15 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The time to import records the time associated with importing a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calulcated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to certain accredited firms under authorized economic operator programs are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.