Time to import (days) in Moldova

Moldova: Time to import (days) was 27 DB06-15 methodology in 2014. ▼ Falling

Latest (2014)
27 DB06-15 methodology
Change on year
down 6.9%
World rank
52nd
of 181 countries
All-time high
31 DB06-15 methodology
in 2005
All-time low
27 DB06-15 methodology
in 2014
Years of data
10
2005–2014

Time to import (days) in Moldova, 2005–2014

01020302005200920142005: 31 DB06-15 methodology2006: 31 DB06-15 methodology2007: 31 DB06-15 methodology2008: 29 DB06-15 methodology2009: 29 DB06-15 methodology2010: 29 DB06-15 methodology2011: 29 DB06-15 methodology2012: 29 DB06-15 methodology2013: 29 DB06-15 methodology2014: 27 DB06-15 methodology

Source: World Bank. Measured in DB06-15 methodology.

Analysis

The most recent figure for time to import (days) in Moldova is 27 DB06-15 methodology, measured in 2014. That is the lowest value across all 10 years on record.

The figure is down 6.9% on the previous year and down 12.9% over ten years.

Over the whole period, time to import (days) in Moldova peaked at 31 DB06-15 methodology in 2005 and was at its lowest, 27 DB06-15 methodology, in 2014.

That places Moldova 52nd out of 181 countries with data for 2014, putting it in the middle of the range.

Averages by decade

DecadeAverage LowestHighest Years
2000s 30.2 DB06-15 methodology 29 DB06-15 methodology 31 DB06-15 methodology 5
2010s 28.6 DB06-15 methodology 27 DB06-15 methodology 29 DB06-15 methodology 5

Countries ranked near Moldova

  1. 52 Rwanda 27 DB06-15 methodology compare
  2. 52 Yemen 27 DB06-15 methodology compare
  3. 55 Indonesia 26 DB06-15 methodology compare
  4. 55 Algeria 26 DB06-15 methodology compare
  5. 55 Haiti 26 DB06-15 methodology compare
  6. 55 Kenya 26 DB06-15 methodology compare
  7. 55 Laos 26 DB06-15 methodology compare
  8. 55 Tanzania 26 DB06-15 methodology compare
  9. 55 East Timor 26 DB06-15 methodology compare

See the full ranking of 183 places →

More reference data data for Moldova

All data for Moldova →

Frequently asked questions

What is time to import (days) in Moldova?
Time to import (days) in Moldova was 27 DB06-15 methodology in 2014, according to the World Bank.
What is the highest time to import (days) recorded in Moldova?
The highest recorded value was 31 DB06-15 methodology in 2005.
What is the lowest time to import (days) recorded in Moldova?
The lowest recorded value was 27 DB06-15 methodology in 2014.
How does Moldova rank for time to import (days)?
Moldova ranks 52nd out of 181 countries with data for 2014.
Is time to import (days) rising or falling in Moldova?
Over the last ten years it is down 12.9%. The long-run trend across the full record is falling.
Where does this Moldova data come from?
The figures come from the World Bank, published as part of Time to import (days) (DB06-15 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 10 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Time to import (days) (DB06-15 methodology)
Unit
DB06-15 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The time to import records the time associated with importing a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calulcated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to certain accredited firms under authorized economic operator programs are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.