Time to import (days) in Yemen
Yemen: Time to import (days) was 27 DB06-15 methodology in 2014. ▼ Falling
Time to import (days) in Yemen, 2005–2014
Source: World Bank. Measured in DB06-15 methodology.
Analysis
The most recent figure for time to import (days) in Yemen is 27 DB06-15 methodology, measured in 2014.
Compared with earlier readings it is up 8.0% on the previous year and down 3.6% over ten years.
Over the whole period, time to import (days) in Yemen peaked at 28 DB06-15 methodology in 2005 and was at its lowest, 25 DB06-15 methodology, in 2009.
That places Yemen 52nd out of 181 countries with data for 2014, putting it in the middle of the range.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 27.4 DB06-15 methodology | 25 DB06-15 methodology | 28 DB06-15 methodology | 5 |
| 2010s | 25.4 DB06-15 methodology | 25 DB06-15 methodology | 27 DB06-15 methodology | 5 |
Countries ranked near Yemen
- 52 Moldova 27 DB06-15 methodology compare
- 52 Rwanda 27 DB06-15 methodology compare
- 55 Indonesia 26 DB06-15 methodology compare
- 55 Algeria 26 DB06-15 methodology compare
- 55 Haiti 26 DB06-15 methodology compare
- 55 Kenya 26 DB06-15 methodology compare
- 55 Laos 26 DB06-15 methodology compare
- 55 Tanzania 26 DB06-15 methodology compare
- 55 East Timor 26 DB06-15 methodology compare
More reference data data for Yemen
- Emission Totals - Direct emissions (N2O) - Manure applied to Soils 0.3943 (2050)
- Emission Totals - Emissions (CO2eq) (AR5) - Enteric Fermentation 7,000 (2050)
- Emission Totals - Emissions (CO2eq) (AR5) - Crop Residues 119.33 (2050)
- Emission Totals - Direct emissions (N2O) - Manure left on Pasture 11.61 (2050)
- Emission Totals - Emissions (CO2eq) (AR5) - Burning - Crop residues 14.66 (2050)
- Emission Totals - Direct emissions (N2O) - Agricultural Soils 13.38 (2050)
- Emission Totals - Emissions (CO2eq) (AR5) - Agricultural Soils 4,698 (2050)
- Emission Totals - Emissions (CO2eq) from N2O (AR5) - Manure Management 58 (2050)
- Emission Totals - Emissions (CO2eq) from N2O (AR5) - Manure left on Pa 4,076 (2050)
- Emission Totals - Emissions (CO2eq) from N2O (AR5) - Crop Residues 119.33 (2050)
Frequently asked questions
- What is time to import (days) in Yemen?
- Time to import (days) in Yemen was 27 DB06-15 methodology in 2014, according to the World Bank.
- What is the highest time to import (days) recorded in Yemen?
- The highest recorded value was 28 DB06-15 methodology in 2005.
- What is the lowest time to import (days) recorded in Yemen?
- The lowest recorded value was 25 DB06-15 methodology in 2009.
- How does Yemen rank for time to import (days)?
- Yemen ranks 52nd out of 181 countries with data for 2014.
- Is time to import (days) rising or falling in Yemen?
- Over the last ten years it is down 3.6%. The long-run trend across the full record is falling.
- Where does this Yemen data come from?
- The figures come from the World Bank, published as part of Time to import (days) (DB06-15 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 10 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time to import records the time associated with importing a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calulcated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to certain accredited firms under authorized economic operator programs are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.