Time to export (days) in Poland
Poland: Time to export (days) was 15 DB06-15 methodology in 2014. ▼ Falling
Time to export (days) in Poland, 2005–2014
Source: World Bank. Measured in DB06-15 methodology.
Analysis
The most recent figure for time to export (days) in Poland is 15 DB06-15 methodology, measured in 2014. That is the lowest value across all 10 years on record.
That represents a change of down 11.8% on the previous year and down 11.8% over ten years.
Over the whole period, time to export (days) in Poland peaked at 17 DB06-15 methodology in 2005 and was at its lowest, 15 DB06-15 methodology, in 2014.
That places Poland 109th out of 181 countries with data for 2014, putting it in the middle of the range.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 17 DB06-15 methodology | 17 DB06-15 methodology | 17 DB06-15 methodology | 5 |
| 2010s | 16.6 DB06-15 methodology | 15 DB06-15 methodology | 17 DB06-15 methodology | 5 |
Countries ranked near Poland
- 109 Belarus 15 DB06-15 methodology compare
- 109 Chile 15 DB06-15 methodology compare
- 109 Greece 15 DB06-15 methodology compare
- 109 Kuwait 15 DB06-15 methodology compare
- 109 Liberia 15 DB06-15 methodology compare
- 109 Philippines 15 DB06-15 methodology compare
- 109 Portugal 15 DB06-15 methodology compare
- 109 Puerto Rico 15 DB06-15 methodology compare
- 109 Qatar 15 DB06-15 methodology compare
- 109 Uruguay 15 DB06-15 methodology compare
More reference data data for Poland
- Emission Totals - Indirect emissions (N2O) - Manure applied to Soils 2.62 (2050)
- Emission Totals - Indirect emissions (N2O) - Manure left on Pasture 0.499 (2050)
- Emission Totals - Indirect emissions (N2O) - IPCC Agriculture 9.36 (2050)
- Emission Totals - Indirect emissions (N2O) - Crop Residues 0.8896 (2050)
- Emission Totals - Indirect emissions (N2O) - Agricultural Soils 9.36 (2050)
- Emission Totals - Emissions (N2O) - Manure applied to Soils 8.77 (2050)
- Emission Totals - Emissions (N2O) - Manure Management 5.77 (2050)
- Emission Totals - Emissions (N2O) - Manure left on Pasture 2.57 (2050)
- Emission Totals - Emissions (N2O) - IPCC Agriculture 43.86 (2050)
- Emission Totals - Emissions (N2O) - Crop Residues 4.84 (2050)
Frequently asked questions
- What is time to export (days) in Poland?
- Time to export (days) in Poland was 15 DB06-15 methodology in 2014, according to the World Bank.
- What is the highest time to export (days) recorded in Poland?
- The highest recorded value was 17 DB06-15 methodology in 2005.
- What is the lowest time to export (days) recorded in Poland?
- The lowest recorded value was 15 DB06-15 methodology in 2014.
- How does Poland rank for time to export (days)?
- Poland ranks 109th out of 181 countries with data for 2014.
- Is time to export (days) rising or falling in Poland?
- Over the last ten years it is down 11.8%. The long-run trend across the full record is falling.
- Where does this Poland data come from?
- The figures come from the World Bank, published as part of Time to export (days) (DB06-15 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 10 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time to export records the time associated with exporting a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calculated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to firms located in an export processing zone, or only to certain accredited firms under authorized economic operator programs, are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.