Poland vs Portugal: Time to export (days)

Poland
15 DB06-15 methodology
in 2014
Portugal
15 DB06-15 methodology
in 2014
Poland rank
109th
Portugal rank
109th

Time to export (days) over time

  • Poland
  • Portugal
05101520200520092014

How they compare

Poland currently reports 15 DB06-15 methodology against 15 DB06-15 methodology in Portugal, a difference of 0 DB06-15 methodology.

The two have swapped places 2 times across 10 shared years of data; in 2005 it was Portugal ahead.

Poland ranks 109th and Portugal ranks 109th of 181 countries.

Poland has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Poland Portugal Difference Ahead
2000s 17 DB06-15 methodology 16.8 DB06-15 methodology 0.2 DB06-15 methodology Poland
2010s 16.6 DB06-15 methodology 15 DB06-15 methodology 1.6 DB06-15 methodology Poland

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time to export (days), Poland or Portugal?
Poland, at 15 DB06-15 methodology against 15 DB06-15 methodology in Portugal as of 2014.
What is the difference in time to export (days) between Poland and Portugal?
0 DB06-15 methodology, with Poland ahead.
How many years of comparable data are there for Poland and Portugal?
10 years are reported by both, from 2005 to 2014.
How do Poland and Portugal rank globally for time to export (days)?
Poland ranks 109th and Portugal ranks 109th of 181 countries.
Where does this data come from?
The World Bank, published as Time to export (days) (DB06-15 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Time to export (days) (DB06-15 methodology)
Unit
DB06-15 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The time to export records the time associated with exporting a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calculated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to firms located in an export processing zone, or only to certain accredited firms under authorized economic operator programs, are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.