Time to export (days) in Uruguay

Uruguay: Time to export (days) was 15 DB06-15 methodology in 2014. ▼ Falling

Latest (2014)
15 DB06-15 methodology
Change on year
down 6.2%
World rank
109th
of 181 countries
All-time high
23 DB06-15 methodology
in 2005
All-time low
15 DB06-15 methodology
in 2014
Years of data
10
2005–2014

Time to export (days) in Uruguay, 2005–2014

05101520252005200920142005: 23 DB06-15 methodology2006: 23 DB06-15 methodology2007: 23 DB06-15 methodology2008: 18 DB06-15 methodology2009: 18 DB06-15 methodology2010: 18 DB06-15 methodology2011: 16 DB06-15 methodology2012: 16 DB06-15 methodology2013: 16 DB06-15 methodology2014: 15 DB06-15 methodology

Source: World Bank. Measured in DB06-15 methodology.

Analysis

The most recent figure for time to export (days) in Uruguay is 15 DB06-15 methodology, measured in 2014. That is the lowest value across all 10 years on record.

That represents a change of down 6.2% on the previous year and down 34.8% over ten years.

Over the whole period, time to export (days) in Uruguay peaked at 23 DB06-15 methodology in 2005 and was at its lowest, 15 DB06-15 methodology, in 2014.

Uruguay ranks 109th of 181 countries on this measure, in the middle of the range.

Averages by decade

DecadeAverage LowestHighest Years
2000s 21 DB06-15 methodology 18 DB06-15 methodology 23 DB06-15 methodology 5
2010s 16.2 DB06-15 methodology 15 DB06-15 methodology 18 DB06-15 methodology 5

Countries ranked near Uruguay

  1. 109 Belarus 15 DB06-15 methodology compare
  2. 109 Chile 15 DB06-15 methodology compare
  3. 109 Greece 15 DB06-15 methodology compare
  4. 109 Kuwait 15 DB06-15 methodology compare
  5. 109 Liberia 15 DB06-15 methodology compare
  6. 109 Philippines 15 DB06-15 methodology compare
  7. 109 Poland 15 DB06-15 methodology compare
  8. 109 Portugal 15 DB06-15 methodology compare
  9. 109 Puerto Rico 15 DB06-15 methodology compare
  10. 109 Qatar 15 DB06-15 methodology compare

See the full ranking of 183 places →

More reference data data for Uruguay

All data for Uruguay →

Frequently asked questions

What is time to export (days) in Uruguay?
Time to export (days) in Uruguay was 15 DB06-15 methodology in 2014, according to the World Bank.
What is the highest time to export (days) recorded in Uruguay?
The highest recorded value was 23 DB06-15 methodology in 2005.
What is the lowest time to export (days) recorded in Uruguay?
The lowest recorded value was 15 DB06-15 methodology in 2014.
How does Uruguay rank for time to export (days)?
Uruguay ranks 109th out of 181 countries with data for 2014.
Is time to export (days) rising or falling in Uruguay?
Over the last ten years it is down 34.8%. The long-run trend across the full record is falling.
Where does this Uruguay data come from?
The figures come from the World Bank, published as part of Time to export (days) (DB06-15 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 10 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Time to export (days) (DB06-15 methodology)
Unit
DB06-15 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The time to export records the time associated with exporting a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calculated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to firms located in an export processing zone, or only to certain accredited firms under authorized economic operator programs, are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.