Time to export (days) in Belarus
Belarus: Time to export (days) was 15 DB06-15 methodology in 2014. ▼ Falling
Time to export (days) in Belarus, 2005–2014
Source: World Bank. Measured in DB06-15 methodology.
Analysis
The most recent figure for time to export (days) in Belarus is 15 DB06-15 methodology, measured in 2014. That is the lowest value across all 10 years on record.
That represents a change of down 31.8% over ten years.
Over the whole period, time to export (days) in Belarus peaked at 22 DB06-15 methodology in 2005 and was at its lowest, 15 DB06-15 methodology, in 2010.
Belarus ranks 109th of 181 countries on this measure, in the middle of the range.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 20 DB06-15 methodology | 16 DB06-15 methodology | 22 DB06-15 methodology | 5 |
| 2010s | 15 DB06-15 methodology | 15 DB06-15 methodology | 15 DB06-15 methodology | 5 |
Countries ranked near Belarus
- 109 Chile 15 DB06-15 methodology compare
- 109 Greece 15 DB06-15 methodology compare
- 109 Kuwait 15 DB06-15 methodology compare
- 109 Liberia 15 DB06-15 methodology compare
- 109 Philippines 15 DB06-15 methodology compare
- 109 Poland 15 DB06-15 methodology compare
- 109 Portugal 15 DB06-15 methodology compare
- 109 Puerto Rico 15 DB06-15 methodology compare
- 109 Qatar 15 DB06-15 methodology compare
- 109 Uruguay 15 DB06-15 methodology compare
More reference data data for Belarus
- Emission Totals - Emissions (CO2eq) from N2O (AR5) - Manure Management 756.48 (2050)
- Emission Totals - Emissions (N2O) - Manure applied to Soils 4.18 (2050)
- Emission Totals - Emissions (N2O) - Agricultural Soils 21.39 (2050)
- Emission Totals - Emissions (CO2eq) from N2O (AR5) - IPCC Agriculture 6,429 (2050)
- Emission Totals - Emissions (CO2eq) from N2O (AR5) - Manure applied to 1,107 (2050)
- Emission Totals - Emissions (CO2eq) from N2O (AR5) - Crop Residues 518.87 (2050)
- Emission Totals - Emissions (CO2eq) from N2O (AR5) - Burning - Crop re 3.52 (2050)
- Emission Totals - Emissions (CO2eq) from N2O (AR5) - Agricultural Soil 5,669 (2050)
- Emission Totals - Emissions (N2O) - Burning - Crop residues 0.0133 (2050)
- Emission Totals - Emissions (CO2eq) from N2O (AR5) - Manure left on Pa 487.54 (2050)
Frequently asked questions
- What is time to export (days) in Belarus?
- Time to export (days) in Belarus was 15 DB06-15 methodology in 2014, according to the World Bank.
- What is the highest time to export (days) recorded in Belarus?
- The highest recorded value was 22 DB06-15 methodology in 2005.
- What is the lowest time to export (days) recorded in Belarus?
- The lowest recorded value was 15 DB06-15 methodology in 2010.
- How does Belarus rank for time to export (days)?
- Belarus ranks 109th out of 181 countries with data for 2014.
- Is time to export (days) rising or falling in Belarus?
- Over the last ten years it is down 31.8%. The long-run trend across the full record is falling.
- Where does this Belarus data come from?
- The figures come from the World Bank, published as part of Time to export (days) (DB06-15 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 10 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time to export records the time associated with exporting a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calculated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to firms located in an export processing zone, or only to certain accredited firms under authorized economic operator programs, are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.