Enforcing contracts: Cost in Maldives
Maldives: Enforcing contracts: Cost was 18.5% in 2019. ▬ Flat
Enforcing contracts: Cost in Maldives, 2003–2019
Source: World Bank. Measured in % of claim.
Analysis
The most recent figure for enforcing contracts: cost in Maldives is 18.5%, measured in 2019. That is the highest value across all 17 years on record.
Compared with earlier readings it is unchanged over ten years.
Over the whole period, enforcing contracts: cost in Maldives peaked at 18.5% in 2003 and was at its lowest, 18.5%, in 2003.
Maldives ranks 163rd of 191 countries on this measure, in the bottom quarter.
Enforcing contracts: Cost in Maldives, year by year
| Year | % of claim | Change |
|---|---|---|
| 2003 | 18.5% | — |
| 2004 | 18.5% | +0.0% |
| 2005 | 18.5% | +0.0% |
| 2006 | 18.5% | +0.0% |
| 2007 | 18.5% | +0.0% |
| 2008 | 18.5% | +0.0% |
| 2009 | 18.5% | +0.0% |
| 2010 | 18.5% | +0.0% |
| 2011 | 18.5% | +0.0% |
| 2012 | 18.5% | +0.0% |
| 2013 | 18.5% | +0.0% |
| 2014 | 18.5% | +0.0% |
| 2015 | 18.5% | +0.0% |
| 2016 | 18.5% | +0.0% |
| 2017 | 18.5% | +0.0% |
| 2018 | 18.5% | +0.0% |
| 2019 | 18.5% | +0.0% |
Maldives compared with similar countries
- Maldives's 18.5% is below the median for upper middle income countries, which is 28.8%, 64% of the median. (56 countries reporting)
- Maldives's 18.5% is below the median for South Asia, which is 25.2%, 73% of the median. (6 countries reporting)
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 18.5% | 18.5% | 18.5% | 7 |
| 2010s | 18.5% | 18.5% | 18.5% | 10 |
Countries ranked near Maldives
More reference data data for Maldives
- Emission Totals - Indirect emissions (N2O) - IPCC Agriculture 0.0011 (2050)
- Emission Totals - Indirect emissions (N2O) - Crop Residues 0 (2050)
- Emission Totals - Indirect emissions (N2O) - Agricultural Soils 0.0011 (2050)
- Emission Totals - Emissions (N2O) - IPCC Agriculture 0.0044 (2050)
- Emission Totals - Emissions (N2O) - Crop Residues 0 (2050)
- Emission Totals - Emissions (N2O) - Burning - Crop residues 0 (2050)
- Emission Totals - Emissions (N2O) - Agricultural Soils 0.0044 (2050)
- Emission Totals - Emissions (CO2eq) from N2O (AR5) - IPCC Agriculture 1.16 (2050)
- Emission Totals - Emissions (CO2eq) from N2O (AR5) - Crop Residues 0.012 (2050)
- Emission Totals - Emissions (CO2eq) from N2O (AR5) - Burning - Crop 0.0004 (2050)
Frequently asked questions
- What is enforcing contracts: cost in Maldives?
- Enforcing contracts: cost in Maldives was 18.5% in 2019, according to the World Bank.
- What is the highest enforcing contracts: cost recorded in Maldives?
- The highest recorded value was 18.5% in 2003.
- What is the lowest enforcing contracts: cost recorded in Maldives?
- The lowest recorded value was 18.5% in 2003.
- How does Maldives rank for enforcing contracts: cost?
- Maldives ranks 163rd out of 191 countries with data for 2019.
- Is enforcing contracts: cost rising or falling in Maldives?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Maldives data come from?
- The figures come from the World Bank, published as part of Enforcing contracts: Cost (% of claim). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 17 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The cost to enforce contracts is recorded as a percentage of the claim value, assumed to be equivalent to 200% of income per capita or $5,000, whichever is greater. Three types of costs are recorded: average attorney fees, court costs and enforcement costs. Bribes are not taken into account.