Time to import (days) in Sri Lanka

Sri Lanka: Time to import (days) was 13 DB06-15 methodology in 2014. ▼ Falling

Latest (2014)
13 DB06-15 methodology
Change on year
down 23.5%
World rank
131st
of 181 countries
All-time high
26 DB06-15 methodology
in 2005
All-time low
13 DB06-15 methodology
in 2014
Years of data
10
2005–2014

Time to import (days) in Sri Lanka, 2005–2014

01020302005200920142005: 26 DB06-15 methodology2006: 26 DB06-15 methodology2007: 20 DB06-15 methodology2008: 20 DB06-15 methodology2009: 20 DB06-15 methodology2010: 19 DB06-15 methodology2011: 19 DB06-15 methodology2012: 19 DB06-15 methodology2013: 17 DB06-15 methodology2014: 13 DB06-15 methodology

Source: World Bank. Measured in DB06-15 methodology.

Analysis

In 2014, time to import (days) in Sri Lanka stood at 13 DB06-15 methodology. That is the lowest value across all 10 years on record.

The figure is down 23.5% on the previous year and down 50.0% over ten years.

Over the whole period, time to import (days) in Sri Lanka peaked at 26 DB06-15 methodology in 2005 and was at its lowest, 13 DB06-15 methodology, in 2014.

Sri Lanka ranks 131st of 181 countries on this measure, in the middle of the range.

Averages by decade

DecadeAverage LowestHighest Years
2000s 22.4 DB06-15 methodology 20 DB06-15 methodology 26 DB06-15 methodology 5
2010s 17.4 DB06-15 methodology 13 DB06-15 methodology 19 DB06-15 methodology 5

Countries ranked near Sri Lanka

  1. 131 Bahamas 13 DB06-15 methodology compare
  2. 131 Bosnia and Herzegovina 13 DB06-15 methodology compare
  3. 131 Colombia 13 DB06-15 methodology compare
  4. 131 Portugal 13 DB06-15 methodology compare
  5. 131 Romania 13 DB06-15 methodology compare
  6. 131 Saint Lucia 13 DB06-15 methodology compare
  7. 131 Saint Vincent and the Grenadines 13 DB06-15 methodology compare
  8. 131 Thailand 13 DB06-15 methodology compare

See the full ranking of 183 places →

More reference data data for Sri Lanka

All data for Sri Lanka →

Frequently asked questions

What is time to import (days) in Sri Lanka?
Time to import (days) in Sri Lanka was 13 DB06-15 methodology in 2014, according to the World Bank.
What is the highest time to import (days) recorded in Sri Lanka?
The highest recorded value was 26 DB06-15 methodology in 2005.
What is the lowest time to import (days) recorded in Sri Lanka?
The lowest recorded value was 13 DB06-15 methodology in 2014.
How does Sri Lanka rank for time to import (days)?
Sri Lanka ranks 131st out of 181 countries with data for 2014.
Is time to import (days) rising or falling in Sri Lanka?
Over the last ten years it is down 50.0%. The long-run trend across the full record is falling.
Where does this Sri Lanka data come from?
The figures come from the World Bank, published as part of Time to import (days) (DB06-15 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 10 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Time to import (days) (DB06-15 methodology)
Unit
DB06-15 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The time to import records the time associated with importing a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calulcated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to certain accredited firms under authorized economic operator programs are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.