Time to import (days) in Colombia
Colombia: Time to import (days) was 13 DB06-15 methodology in 2014. ◆ Volatile
Time to import (days) in Colombia, 2005–2014
Source: World Bank. Measured in DB06-15 methodology.
Analysis
In 2014, time to import (days) in Colombia stood at 13 DB06-15 methodology. That is the lowest value across all 10 years on record.
That represents a change of down 72.9% over ten years.
Over the whole period, time to import (days) in Colombia peaked at 48 DB06-15 methodology in 2005 and was at its lowest, 13 DB06-15 methodology, in 2010.
That places Colombia 131st out of 181 countries with data for 2014, putting it in the middle of the range.
The series is highly variable year to year, so single readings are best treated with caution.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 26.4 DB06-15 methodology | 14 DB06-15 methodology | 48 DB06-15 methodology | 5 |
| 2010s | 13 DB06-15 methodology | 13 DB06-15 methodology | 13 DB06-15 methodology | 5 |
Countries ranked near Colombia
- 131 Bahamas 13 DB06-15 methodology compare
- 131 Bosnia and Herzegovina 13 DB06-15 methodology compare
- 131 Portugal 13 DB06-15 methodology compare
- 131 Romania 13 DB06-15 methodology compare
- 131 Sri Lanka 13 DB06-15 methodology compare
- 131 Saint Lucia 13 DB06-15 methodology compare
- 131 Saint Vincent and the Grenadines 13 DB06-15 methodology compare
- 131 Thailand 13 DB06-15 methodology compare
More reference data data for Colombia
- Emission Totals - Indirect emissions (N2O) - Manure applied to Soils 2.92 (2050)
- Emission Totals - Indirect emissions (N2O) - Manure left on Pasture 11.17 (2050)
- Emission Totals - Indirect emissions (N2O) - IPCC Agriculture 19.02 (2050)
- Emission Totals - Indirect emissions (N2O) - Crop Residues 0.4113 (2050)
- Emission Totals - Indirect emissions (N2O) - Agricultural Soils 19.02 (2050)
- Emission Totals - Emissions (N2O) - Manure applied to Soils 9.81 (2050)
- Emission Totals - Emissions (N2O) - Manure Management 2.67 (2050)
- Emission Totals - Emissions (N2O) - Manure left on Pasture 61.25 (2050)
- Emission Totals - Emissions (N2O) - IPCC Agriculture 94.56 (2050)
- Emission Totals - Emissions (N2O) - Crop Residues 2.24 (2050)
Frequently asked questions
- What is time to import (days) in Colombia?
- Time to import (days) in Colombia was 13 DB06-15 methodology in 2014, according to the World Bank.
- What is the highest time to import (days) recorded in Colombia?
- The highest recorded value was 48 DB06-15 methodology in 2005.
- What is the lowest time to import (days) recorded in Colombia?
- The lowest recorded value was 13 DB06-15 methodology in 2010.
- How does Colombia rank for time to import (days)?
- Colombia ranks 131st out of 181 countries with data for 2014.
- Is time to import (days) rising or falling in Colombia?
- Over the last ten years it is down 72.9%. The long-run trend across the full record is volatile.
- Where does this Colombia data come from?
- The figures come from the World Bank, published as part of Time to import (days) (DB06-15 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 10 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time to import records the time associated with importing a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calulcated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to certain accredited firms under authorized economic operator programs are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.