Time to import (days) in Armenia

Armenia: Time to import (days) was 18 DB06-15 methodology in 2014. ▼ Falling

Latest (2014)
18 DB06-15 methodology
Change on year
unchanged
World rank
98th
of 181 countries
All-time high
37 DB06-15 methodology
in 2005
All-time low
18 DB06-15 methodology
in 2010
Years of data
10
2005–2014

Time to import (days) in Armenia, 2005–2014

0102030402005200920142005: 37 DB06-15 methodology2006: 37 DB06-15 methodology2007: 24 DB06-15 methodology2008: 24 DB06-15 methodology2009: 20 DB06-15 methodology2010: 18 DB06-15 methodology2011: 18 DB06-15 methodology2012: 18 DB06-15 methodology2013: 18 DB06-15 methodology2014: 18 DB06-15 methodology

Source: World Bank. Measured in DB06-15 methodology.

Analysis

Armenia recorded 18 DB06-15 methodology for time to import (days) in 2014. That is the lowest value across all 10 years on record.

Compared with earlier readings it is down 51.4% over ten years.

Over the whole period, time to import (days) in Armenia peaked at 37 DB06-15 methodology in 2005 and was at its lowest, 18 DB06-15 methodology, in 2010.

Armenia ranks 98th of 181 countries on this measure, in the middle of the range.

Averages by decade

DecadeAverage LowestHighest Years
2000s 28.4 DB06-15 methodology 20 DB06-15 methodology 37 DB06-15 methodology 5
2010s 18 DB06-15 methodology 18 DB06-15 methodology 18 DB06-15 methodology 5

Countries ranked near Armenia

  1. 97 Pakistan 18.4 DB06-15 methodology compare
  2. 98 Albania 18 DB06-15 methodology compare
  3. 98 Italy 18 DB06-15 methodology compare
  4. 101 Brazil 17 DB06-15 methodology compare
  5. 101 Bulgaria 17 DB06-15 methodology compare
  6. 101 Czechia 17 DB06-15 methodology compare
  7. 101 Jamaica 17 DB06-15 methodology compare
  8. 101 Peru 17 DB06-15 methodology compare
  9. 101 Saudi Arabia 17 DB06-15 methodology compare
  10. 101 Seychelles 17 DB06-15 methodology compare

See the full ranking of 183 places →

More reference data data for Armenia

All data for Armenia →

Frequently asked questions

What is time to import (days) in Armenia?
Time to import (days) in Armenia was 18 DB06-15 methodology in 2014, according to the World Bank.
What is the highest time to import (days) recorded in Armenia?
The highest recorded value was 37 DB06-15 methodology in 2005.
What is the lowest time to import (days) recorded in Armenia?
The lowest recorded value was 18 DB06-15 methodology in 2010.
How does Armenia rank for time to import (days)?
Armenia ranks 98th out of 181 countries with data for 2014.
Is time to import (days) rising or falling in Armenia?
Over the last ten years it is down 51.4%. The long-run trend across the full record is falling.
Where does this Armenia data come from?
The figures come from the World Bank, published as part of Time to import (days) (DB06-15 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 10 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Time to import (days) (DB06-15 methodology)
Unit
DB06-15 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The time to import records the time associated with importing a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calulcated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to certain accredited firms under authorized economic operator programs are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.