Time to export (days) in Tonga
Tonga: Time to export (days) was 22 DB06-15 methodology in 2014. ▲ Rising
Time to export (days) in Tonga, 2005–2014
Source: World Bank. Measured in DB06-15 methodology.
Analysis
In 2014, time to export (days) in Tonga stood at 22 DB06-15 methodology. That is the highest value across all 10 years on record.
The figure is up 4.8% over ten years.
Over the whole period, time to export (days) in Tonga peaked at 22 DB06-15 methodology in 2011 and was at its lowest, 21 DB06-15 methodology, in 2005.
Tonga ranks 59th of 181 countries on this measure, in the middle of the range.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 21 DB06-15 methodology | 21 DB06-15 methodology | 21 DB06-15 methodology | 5 |
| 2010s | 21.8 DB06-15 methodology | 21 DB06-15 methodology | 22 DB06-15 methodology | 5 |
Countries ranked near Tonga
- 58 Nigeria 22.92 DB06-15 methodology compare
- 59 Bolivia 22 DB06-15 methodology compare
- 59 Cambodia 22 DB06-15 methodology compare
- 59 Lebanon 22 DB06-15 methodology compare
- 59 Madagascar 22 DB06-15 methodology compare
- 59 Solomon Islands 22 DB06-15 methodology compare
- 59 Suriname 22 DB06-15 methodology compare
More reference data data for Tonga
- Emission Totals - Indirect emissions (N2O) - Agricultural Soils 0.0197 (2050)
- Emission Totals - Emissions (CO2eq) from N2O (AR5) - Manure applied to 9.35 (2050)
- Emission Totals - Emissions (N2O) - Manure Management 0.0269 (2050)
- Emission Totals - Emissions (N2O) - Manure left on Pasture 0.0446 (2050)
- Emission Totals - Emissions (N2O) - Agricultural Soils 0.0799 (2050)
- Emission Totals - Emissions (CO2eq) from N2O (AR5) - IPCC Agriculture 28.31 (2050)
- Emission Totals - Emissions (CO2eq) from N2O (AR5) - Agricultural Soil 21.17 (2050)
- Emission Totals - Emissions (N2O) - IPCC Agriculture 0.1068 (2050)
- Emission Totals - Indirect emissions (N2O) - Manure left on Pasture 0.0092 (2050)
- Emission Totals - Indirect emissions (N2O) - Manure applied to Soils 0.0105 (2050)
Frequently asked questions
- What is time to export (days) in Tonga?
- Time to export (days) in Tonga was 22 DB06-15 methodology in 2014, according to the World Bank.
- What is the highest time to export (days) recorded in Tonga?
- The highest recorded value was 22 DB06-15 methodology in 2011.
- What is the lowest time to export (days) recorded in Tonga?
- The lowest recorded value was 21 DB06-15 methodology in 2005.
- How does Tonga rank for time to export (days)?
- Tonga ranks 59th out of 181 countries with data for 2014.
- Is time to export (days) rising or falling in Tonga?
- Over the last ten years it is up 4.8%. The long-run trend across the full record is rising.
- Where does this Tonga data come from?
- The figures come from the World Bank, published as part of Time to export (days) (DB06-15 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 10 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time to export records the time associated with exporting a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calculated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to firms located in an export processing zone, or only to certain accredited firms under authorized economic operator programs, are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.