Time to export (days) in Madagascar
Madagascar: Time to export (days) was 22 DB06-15 methodology in 2014. ▼ Falling
Time to export (days) in Madagascar, 2005–2014
Source: World Bank. Measured in DB06-15 methodology.
Analysis
The most recent figure for time to export (days) in Madagascar is 22 DB06-15 methodology, measured in 2014. That is the lowest value across all 10 years on record.
The figure is down 55.1% over ten years.
Over the whole period, time to export (days) in Madagascar peaked at 49 DB06-15 methodology in 2005 and was at its lowest, 22 DB06-15 methodology, in 2009.
Madagascar ranks 59th of 181 countries on this measure, in the middle of the range.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 34.6 DB06-15 methodology | 22 DB06-15 methodology | 49 DB06-15 methodology | 5 |
| 2010s | 22 DB06-15 methodology | 22 DB06-15 methodology | 22 DB06-15 methodology | 5 |
Countries ranked near Madagascar
- 58 Nigeria 22.92 DB06-15 methodology compare
- 59 Bolivia 22 DB06-15 methodology compare
- 59 Cambodia 22 DB06-15 methodology compare
- 59 Lebanon 22 DB06-15 methodology compare
- 59 Solomon Islands 22 DB06-15 methodology compare
- 59 Suriname 22 DB06-15 methodology compare
- 59 Tonga 22 DB06-15 methodology compare
More reference data data for Madagascar
- Emission Totals - Emissions (N2O) - Crop Residues 2.45 (2050)
- Emission Totals - Indirect emissions (N2O) - Crop Residues 0.4503 (2050)
- Emission Totals - Emissions (N2O) - Manure applied to Soils 1.5 (2050)
- Emission Totals - Emissions (N2O) - Burning - Crop residues 0.1053 (2050)
- Emission Totals - Emissions (CO2eq) from N2O (AR5) - Manure Management 379.54 (2050)
- Emission Totals - Emissions (N2O) - Manure left on Pasture 26.56 (2050)
- Emission Totals - Indirect emissions (N2O) - Agricultural Soils 5.9 (2050)
- Emission Totals - Emissions (N2O) - IPCC Agriculture 32.81 (2050)
- Emission Totals - Indirect emissions (N2O) - IPCC Agriculture 5.9 (2050)
- Emission Totals - Emissions (N2O) - Manure Management 1.43 (2050)
Frequently asked questions
- What is time to export (days) in Madagascar?
- Time to export (days) in Madagascar was 22 DB06-15 methodology in 2014, according to the World Bank.
- What is the highest time to export (days) recorded in Madagascar?
- The highest recorded value was 49 DB06-15 methodology in 2005.
- What is the lowest time to export (days) recorded in Madagascar?
- The lowest recorded value was 22 DB06-15 methodology in 2009.
- How does Madagascar rank for time to export (days)?
- Madagascar ranks 59th out of 181 countries with data for 2014.
- Is time to export (days) rising or falling in Madagascar?
- Over the last ten years it is down 55.1%. The long-run trend across the full record is falling.
- Where does this Madagascar data come from?
- The figures come from the World Bank, published as part of Time to export (days) (DB06-15 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 10 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time to export records the time associated with exporting a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calculated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to firms located in an export processing zone, or only to certain accredited firms under authorized economic operator programs, are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.