Time to export (days) in Lithuania

Lithuania: Time to export (days) was 10 DB06-15 methodology in 2014. ▬ Flat

Latest (2014)
10 DB06-15 methodology
Change on year
unchanged
World rank
146th
of 181 countries
All-time high
10 DB06-15 methodology
in 2005
All-time low
9 DB06-15 methodology
in 2011
Years of data
10
2005–2014

Time to export (days) in Lithuania, 2005–2014

02468102005200920142005: 10 DB06-15 methodology2006: 10 DB06-15 methodology2007: 10 DB06-15 methodology2008: 10 DB06-15 methodology2009: 10 DB06-15 methodology2010: 10 DB06-15 methodology2011: 9 DB06-15 methodology2012: 9 DB06-15 methodology2013: 10 DB06-15 methodology2014: 10 DB06-15 methodology

Source: World Bank. Measured in DB06-15 methodology.

Analysis

In 2014, time to export (days) in Lithuania stood at 10 DB06-15 methodology. That is the highest value across all 10 years on record.

That represents a change of unchanged over ten years.

Over the whole period, time to export (days) in Lithuania peaked at 10 DB06-15 methodology in 2005 and was at its lowest, 9 DB06-15 methodology, in 2011.

That places Lithuania 146th out of 181 countries with data for 2014, putting it in the bottom quarter.

Averages by decade

DecadeAverage LowestHighest Years
2000s 10 DB06-15 methodology 10 DB06-15 methodology 10 DB06-15 methodology 5
2010s 9.6 DB06-15 methodology 9 DB06-15 methodology 10 DB06-15 methodology 5

Countries ranked near Lithuania

  1. 146 Austria 10 DB06-15 methodology compare
  2. 146 France 10 DB06-15 methodology compare
  3. 146 Iceland 10 DB06-15 methodology compare
  4. 146 Israel 10 DB06-15 methodology compare
  5. 146 Latvia 10 DB06-15 methodology compare
  6. 146 Mauritius 10 DB06-15 methodology compare
  7. 146 Morocco 10 DB06-15 methodology compare
  8. 146 New Zealand 10 DB06-15 methodology compare
  9. 146 Oman 10 DB06-15 methodology compare
  10. 146 Panama 10 DB06-15 methodology compare
  11. 146 Spain 10 DB06-15 methodology compare
  12. 146 Taiwan 10 DB06-15 methodology compare

See the full ranking of 183 places →

More reference data data for Lithuania

All data for Lithuania →

Frequently asked questions

What is time to export (days) in Lithuania?
Time to export (days) in Lithuania was 10 DB06-15 methodology in 2014, according to the World Bank.
What is the highest time to export (days) recorded in Lithuania?
The highest recorded value was 10 DB06-15 methodology in 2005.
What is the lowest time to export (days) recorded in Lithuania?
The lowest recorded value was 9 DB06-15 methodology in 2011.
How does Lithuania rank for time to export (days)?
Lithuania ranks 146th out of 181 countries with data for 2014.
Is time to export (days) rising or falling in Lithuania?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Lithuania data come from?
The figures come from the World Bank, published as part of Time to export (days) (DB06-15 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 10 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Time to export (days) (DB06-15 methodology)
Unit
DB06-15 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The time to export records the time associated with exporting a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calculated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to firms located in an export processing zone, or only to certain accredited firms under authorized economic operator programs, are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.