Iceland vs Lithuania: Time to export (days)

Iceland
10 DB06-15 methodology
in 2014
Lithuania
10 DB06-15 methodology
in 2014
Iceland rank
146th
Lithuania rank
146th

Time to export (days) over time

  • Iceland
  • Lithuania
051015200520092014

How they compare

Iceland currently reports 10 DB06-15 methodology against 10 DB06-15 methodology in Lithuania, a difference of 0 DB06-15 methodology.

The two have swapped places 2 times across 10 shared years of data; in 2005 it was Lithuania ahead.

Iceland ranks 146th and Lithuania ranks 146th of 181 countries.

Iceland has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Iceland Lithuania Difference Ahead
2000s 10.8 DB06-15 methodology 10 DB06-15 methodology 0.8 DB06-15 methodology Iceland
2010s 12.4 DB06-15 methodology 9.6 DB06-15 methodology 2.8 DB06-15 methodology Iceland

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time to export (days), Iceland or Lithuania?
Iceland, at 10 DB06-15 methodology against 10 DB06-15 methodology in Lithuania as of 2014.
What is the difference in time to export (days) between Iceland and Lithuania?
0 DB06-15 methodology, with Iceland ahead.
How many years of comparable data are there for Iceland and Lithuania?
10 years are reported by both, from 2005 to 2014.
How do Iceland and Lithuania rank globally for time to export (days)?
Iceland ranks 146th and Lithuania ranks 146th of 181 countries.
Where does this data come from?
The World Bank, published as Time to export (days) (DB06-15 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Time to export (days) (DB06-15 methodology)
Unit
DB06-15 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The time to export records the time associated with exporting a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calculated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to firms located in an export processing zone, or only to certain accredited firms under authorized economic operator programs, are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.