Time to export (days) in Democratic Republic of Congo
Democratic Republic of Congo: Time to export (days) was 44 DB06-15 methodology in 2014. ▼ Falling
Time to export (days) in Democratic Republic of Congo, 2005–2014
Source: World Bank. Measured in DB06-15 methodology.
Analysis
Democratic Republic of Congo recorded 44 DB06-15 methodology for time to export (days) in 2014. That is the lowest value across all 10 years on record.
That represents a change of down 4.3% over ten years.
Over the whole period, time to export (days) in Democratic Republic of Congo peaked at 46 DB06-15 methodology in 2005 and was at its lowest, 44 DB06-15 methodology, in 2009.
Democratic Republic of Congo ranks 15th of 181 countries on this measure, in the top 10%.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 45.6 DB06-15 methodology | 44 DB06-15 methodology | 46 DB06-15 methodology | 5 |
| 2010s | 44 DB06-15 methodology | 44 DB06-15 methodology | 44 DB06-15 methodology | 5 |
Countries ranked near Democratic Republic of Congo
More reference data data for Democratic Republic of Congo
- Emission Totals - Emissions (CO2eq) (AR5) - Burning - Crop residues 293.08 (2050)
- Emission Totals - Emissions (CO2eq) from CH4 (AR5) - Manure Management 220.65 (2050)
- Emission Totals - Emissions (CO2eq) from CH4 (AR5) - IPCC Agriculture 3,924 (2050)
- Emission Totals - Emissions (CO2eq) from N2O (AR5) - IPCC Agriculture 3,062 (2050)
- Emission Totals - Emissions (N2O) - Agricultural Soils 9.9 (2050)
- Emission Totals - Emissions (N2O) - Manure applied to Soils 1.18 (2050)
- Emission Totals - Emissions (CO2eq) from CH4 (AR5) - Burning - Crop re 235.34 (2050)
- Emission Totals - Emissions (CO2eq) (AR5) - Manure applied to Soils 313.43 (2050)
- Emission Totals - Emissions (N2O) - Burning - Crop residues 0.2179 (2050)
- Emission Totals - Emissions (CO2eq) from N2O (AR5) - Manure applied to 313.43 (2050)
Frequently asked questions
- What is time to export (days) in Democratic Republic of Congo?
- Time to export (days) in Democratic Republic of Congo was 44 DB06-15 methodology in 2014, according to the World Bank.
- What is the highest time to export (days) recorded in Democratic Republic of Congo?
- The highest recorded value was 46 DB06-15 methodology in 2005.
- What is the lowest time to export (days) recorded in Democratic Republic of Congo?
- The lowest recorded value was 44 DB06-15 methodology in 2009.
- How does Democratic Republic of Congo rank for time to export (days)?
- Democratic Republic of Congo ranks 15th out of 181 countries with data for 2014.
- Is time to export (days) rising or falling in Democratic Republic of Congo?
- Over the last ten years it is down 4.3%. The long-run trend across the full record is falling.
- Where does this Democratic Republic of Congo data come from?
- The figures come from the World Bank, published as part of Time to export (days) (DB06-15 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 10 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time to export records the time associated with exporting a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calculated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to firms located in an export processing zone, or only to certain accredited firms under authorized economic operator programs, are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.