Time to export (days) in Burkina Faso

Burkina Faso: Time to export (days) was 41 DB06-15 methodology in 2014. ▼ Falling

Latest (2014)
41 DB06-15 methodology
Change on year
unchanged
World rank
18th
of 181 countries
All-time high
45 DB06-15 methodology
in 2005
All-time low
41 DB06-15 methodology
in 2009
Years of data
10
2005–2014

Time to export (days) in Burkina Faso, 2005–2014

010203040502005200920142005: 45 DB06-15 methodology2006: 45 DB06-15 methodology2007: 45 DB06-15 methodology2008: 45 DB06-15 methodology2009: 41 DB06-15 methodology2010: 41 DB06-15 methodology2011: 41 DB06-15 methodology2012: 41 DB06-15 methodology2013: 41 DB06-15 methodology2014: 41 DB06-15 methodology

Source: World Bank. Measured in DB06-15 methodology.

Analysis

The most recent figure for time to export (days) in Burkina Faso is 41 DB06-15 methodology, measured in 2014. That is the lowest value across all 10 years on record.

That represents a change of down 8.9% over ten years.

Over the whole period, time to export (days) in Burkina Faso peaked at 45 DB06-15 methodology in 2005 and was at its lowest, 41 DB06-15 methodology, in 2009.

That places Burkina Faso 18th out of 181 countries with data for 2014, putting it in the top 10%.

Averages by decade

DecadeAverage LowestHighest Years
2000s 44.2 DB06-15 methodology 41 DB06-15 methodology 45 DB06-15 methodology 5
2010s 41 DB06-15 methodology 41 DB06-15 methodology 41 DB06-15 methodology 5

Countries ranked near Burkina Faso

  1. 15 Democratic Republic of Congo 44 DB06-15 methodology compare
  2. 15 Ethiopia 44 DB06-15 methodology compare
  3. 15 Mongolia 44 DB06-15 methodology compare
  4. 19 Angola 40 DB06-15 methodology compare
  5. 19 Nepal 40 DB06-15 methodology compare
  6. 21 Bhutan 38 DB06-15 methodology compare

See the full ranking of 183 places →

More reference data data for Burkina Faso

All data for Burkina Faso →

Frequently asked questions

What is time to export (days) in Burkina Faso?
Time to export (days) in Burkina Faso was 41 DB06-15 methodology in 2014, according to the World Bank.
What is the highest time to export (days) recorded in Burkina Faso?
The highest recorded value was 45 DB06-15 methodology in 2005.
What is the lowest time to export (days) recorded in Burkina Faso?
The lowest recorded value was 41 DB06-15 methodology in 2009.
How does Burkina Faso rank for time to export (days)?
Burkina Faso ranks 18th out of 181 countries with data for 2014.
Is time to export (days) rising or falling in Burkina Faso?
Over the last ten years it is down 8.9%. The long-run trend across the full record is falling.
Where does this Burkina Faso data come from?
The figures come from the World Bank, published as part of Time to export (days) (DB06-15 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 10 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Time to export (days) (DB06-15 methodology)
Unit
DB06-15 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The time to export records the time associated with exporting a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calculated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to firms located in an export processing zone, or only to certain accredited firms under authorized economic operator programs, are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.