Length of railway lines by maximum permitted speed in Croatia
Croatia: Length of railway lines by maximum permitted speed was 2,617 Kilometre in 2024. ▬ Flat
Latest (2024)
2,617 Kilometre
Change on year
unchanged
World rank
22nd
of 39 countries
All-time high
2,726 Kilometre
in 1995
All-time low
2,444 Kilometre
in 1990
Years of data
35
1990–2024
Length of railway lines by maximum permitted speed in Croatia, 1990–2024
Source: Eurostat. Measured in Kilometre.
Analysis
The most recent figure for length of railway lines by maximum permitted speed in Croatia is 2,617 Kilometre, measured in 2024.
Compared with earlier readings it is up 0.5% over ten years.
Over the whole period, length of railway lines by maximum permitted speed in Croatia peaked at 2,726 Kilometre in 1995 and was at its lowest, 2,444 Kilometre, in 1990.
Croatia ranks 22nd of 39 countries on this measure, in the middle of the range.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 1990s | 2,687 Kilometre | 2,444 Kilometre | 2,726 Kilometre | 10 |
| 2000s | 2,724 Kilometre | 2,722 Kilometre | 2,726 Kilometre | 10 |
| 2010s | 2,652 Kilometre | 2,604 Kilometre | 2,722 Kilometre | 10 |
| 2020s | 2,617 Kilometre | 2,617 Kilometre | 2,617 Kilometre | 5 |
Countries ranked near Croatia
More reference data data for Croatia
- Emission Totals - Indirect emissions (N2O) - Manure applied to Soils 0.2598 (2050)
- Emission Totals - Indirect emissions (N2O) - Manure left on Pasture 0.1516 (2050)
- Emission Totals - Indirect emissions (N2O) - IPCC Agriculture 1.85 (2050)
- Emission Totals - Indirect emissions (N2O) - Crop Residues 0.1326 (2050)
- Emission Totals - Indirect emissions (N2O) - Agricultural Soils 1.85 (2050)
- Emission Totals - Emissions (N2O) - Manure applied to Soils 0.8711 (2050)
- Emission Totals - Emissions (N2O) - Manure Management 0.5399 (2050)
- Emission Totals - Emissions (N2O) - Manure left on Pasture 0.6476 (2050)
- Emission Totals - Emissions (N2O) - IPCC Agriculture 8.13 (2050)
- Emission Totals - Emissions (N2O) - Crop Residues 0.7218 (2050)
Frequently asked questions
- What is length of railway lines by maximum permitted speed in Croatia?
- Length of railway lines by maximum permitted speed in Croatia was 2,617 Kilometre in 2024, according to Eurostat.
- What is the highest length of railway lines by maximum permitted speed recorded in Croatia?
- The highest recorded value was 2,726 Kilometre in 1995.
- What is the lowest length of railway lines by maximum permitted speed recorded in Croatia?
- The lowest recorded value was 2,444 Kilometre in 1990.
- How does Croatia rank for length of railway lines by maximum permitted speed?
- Croatia ranks 22nd out of 39 countries with data for 2024.
- Is length of railway lines by maximum permitted speed rising or falling in Croatia?
- Over the last ten years it is up 0.5%. The long-run trend across the full record is flat.
- Where does this Croatia data come from?
- The figures come from Eurostat, published as part of Length of railway lines by maximum permitted speed. Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 35 observations, free to reuse under CC BY 4.0 (Eurostat).