Indonesia vs East Timor: Time to import (days)

Indonesia
26 DB06-15 methodology
in 2014
East Timor
26 DB06-15 methodology
in 2014
Indonesia rank
55th
East Timor rank
55th

Time to import (days) over time

  • Indonesia
  • East Timor
0102030200520092014

How they compare

Indonesia currently reports 26 DB06-15 methodology against 26 DB06-15 methodology in East Timor, a difference of 0 DB06-15 methodology.

The two have swapped places 1 time across 10 shared years of data; in 2005 it was Indonesia ahead.

Indonesia ranks 55th and East Timor ranks 55th of 181 countries.

Across the 2 decades both report, Indonesia averaged higher in 1 and East Timor in 1.

Head to head by decade

Decade Indonesia East Timor Difference Ahead
2000s 27 DB06-15 methodology 26 DB06-15 methodology 1 DB06-15 methodology Indonesia
2010s 25.2 DB06-15 methodology 26 DB06-15 methodology 0.8 DB06-15 methodology East Timor

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time to import (days), Indonesia or East Timor?
Indonesia, at 26 DB06-15 methodology against 26 DB06-15 methodology in East Timor as of 2014.
What is the difference in time to import (days) between Indonesia and East Timor?
0 DB06-15 methodology, with Indonesia ahead.
How many years of comparable data are there for Indonesia and East Timor?
10 years are reported by both, from 2005 to 2014.
How do Indonesia and East Timor rank globally for time to import (days)?
Indonesia ranks 55th and East Timor ranks 55th of 181 countries.
Where does this data come from?
The World Bank, published as Time to import (days) (DB06-15 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Time to import (days) (DB06-15 methodology)
Unit
DB06-15 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The time to import records the time associated with importing a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calulcated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to certain accredited firms under authorized economic operator programs are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.