Ghana vs Nepal: Time to import (days)

Ghana
41 DB06-15 methodology
in 2014
Nepal
39 DB06-15 methodology
in 2014
Ghana rank
23rd
Nepal rank
24th

Time to import (days) over time

  • Ghana
  • Nepal
0204060200520092014

How they compare

Ghana currently reports 41 DB06-15 methodology against 39 DB06-15 methodology in Nepal, a difference of 2 DB06-15 methodology.

That makes Ghana's figure about 1.1 times Nepal's.

Across all 10 years both countries report, Ghana has been ahead every year.

Ghana ranks 23rd and Nepal ranks 24th of 181 countries.

Ghana has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Ghana Nepal Difference Ahead
2000s 44.8 DB06-15 methodology 35 DB06-15 methodology 9.8 DB06-15 methodology Ghana
2010s 39.8 DB06-15 methodology 37.2 DB06-15 methodology 2.6 DB06-15 methodology Ghana

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time to import (days), Ghana or Nepal?
Ghana, at 41 DB06-15 methodology against 39 DB06-15 methodology in Nepal as of 2014.
What is the difference in time to import (days) between Ghana and Nepal?
2 DB06-15 methodology, with Ghana ahead.
How many years of comparable data are there for Ghana and Nepal?
10 years are reported by both, from 2005 to 2014.
How do Ghana and Nepal rank globally for time to import (days)?
Ghana ranks 23rd and Nepal ranks 24th of 181 countries.
Where does this data come from?
The World Bank, published as Time to import (days) (DB06-15 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Time to import (days) (DB06-15 methodology)
Unit
DB06-15 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The time to import records the time associated with importing a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calulcated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to certain accredited firms under authorized economic operator programs are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.