Costa Rica vs Slovenia: Time to import (days)

Costa Rica
14 DB06-15 methodology
in 2014
Slovenia
14 DB06-15 methodology
in 2014
Costa Rica rank
119th
Slovenia rank
119th

Time to import (days) over time

  • Costa Rica
  • Slovenia
010203040200520092014

How they compare

Costa Rica currently reports 14 DB06-15 methodology against 14 DB06-15 methodology in Slovenia, a difference of 0 DB06-15 methodology.

The two have swapped places 1 time across 10 shared years of data; in 2005 it was Costa Rica ahead.

Costa Rica ranks 119th and Slovenia ranks 119th of 181 countries.

Across the 2 decades both report, Costa Rica averaged higher in 1 and Slovenia in 1.

Head to head by decade

Decade Costa Rica Slovenia Difference Ahead
2000s 24 DB06-15 methodology 21 DB06-15 methodology 3 DB06-15 methodology Costa Rica
2010s 14 DB06-15 methodology 14.8 DB06-15 methodology 0.8 DB06-15 methodology Slovenia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time to import (days), Costa Rica or Slovenia?
Costa Rica, at 14 DB06-15 methodology against 14 DB06-15 methodology in Slovenia as of 2014.
What is the difference in time to import (days) between Costa Rica and Slovenia?
0 DB06-15 methodology, with Costa Rica ahead.
How many years of comparable data are there for Costa Rica and Slovenia?
10 years are reported by both, from 2005 to 2014.
How do Costa Rica and Slovenia rank globally for time to import (days)?
Costa Rica ranks 119th and Slovenia ranks 119th of 181 countries.
Where does this data come from?
The World Bank, published as Time to import (days) (DB06-15 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Time to import (days) (DB06-15 methodology)
Unit
DB06-15 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The time to import records the time associated with importing a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calulcated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to certain accredited firms under authorized economic operator programs are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.