Time to import (days) in Dominican Republic

Dominican Republic: Time to import (days) was 10 DB06-15 methodology in 2014. ▼ Falling

Latest (2014)
10 DB06-15 methodology
Change on year
unchanged
World rank
147th
of 181 countries
All-time high
17 DB06-15 methodology
in 2005
All-time low
10 DB06-15 methodology
in 2008
Years of data
10
2005–2014

Time to import (days) in Dominican Republic, 2005–2014

0510152005200920142005: 17 DB06-15 methodology2006: 17 DB06-15 methodology2007: 13 DB06-15 methodology2008: 10 DB06-15 methodology2009: 10 DB06-15 methodology2010: 10 DB06-15 methodology2011: 10 DB06-15 methodology2012: 10 DB06-15 methodology2013: 10 DB06-15 methodology2014: 10 DB06-15 methodology

Source: World Bank. Measured in DB06-15 methodology.

Analysis

The most recent figure for time to import (days) in Dominican Republic is 10 DB06-15 methodology, measured in 2014. That is the lowest value across all 10 years on record.

Compared with earlier readings it is down 41.2% over ten years.

Over the whole period, time to import (days) in Dominican Republic peaked at 17 DB06-15 methodology in 2005 and was at its lowest, 10 DB06-15 methodology, in 2008.

That places Dominican Republic 147th out of 181 countries with data for 2014, putting it in the bottom quarter.

Averages by decade

DecadeAverage LowestHighest Years
2000s 13.4 DB06-15 methodology 10 DB06-15 methodology 17 DB06-15 methodology 5
2010s 10 DB06-15 methodology 10 DB06-15 methodology 10 DB06-15 methodology 5

Countries ranked near Dominican Republic

  1. 147 Canada 10 DB06-15 methodology compare
  2. 147 El Salvador 10 DB06-15 methodology compare
  3. 147 Georgia 10 DB06-15 methodology compare
  4. 147 Israel 10 DB06-15 methodology compare
  5. 147 Taiwan 10 DB06-15 methodology compare

See the full ranking of 183 places →

More reference data data for Dominican Republic

All data for Dominican Republic →

Frequently asked questions

What is time to import (days) in Dominican Republic?
Time to import (days) in Dominican Republic was 10 DB06-15 methodology in 2014, according to the World Bank.
What is the highest time to import (days) recorded in Dominican Republic?
The highest recorded value was 17 DB06-15 methodology in 2005.
What is the lowest time to import (days) recorded in Dominican Republic?
The lowest recorded value was 10 DB06-15 methodology in 2008.
How does Dominican Republic rank for time to import (days)?
Dominican Republic ranks 147th out of 181 countries with data for 2014.
Is time to import (days) rising or falling in Dominican Republic?
Over the last ten years it is down 41.2%. The long-run trend across the full record is falling.
Where does this Dominican Republic data come from?
The figures come from the World Bank, published as part of Time to import (days) (DB06-15 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 10 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Time to import (days) (DB06-15 methodology)
Unit
DB06-15 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The time to import records the time associated with importing a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calulcated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to certain accredited firms under authorized economic operator programs are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.