Time to export (days) in West Bank and Gaza
West Bank and Gaza: Time to export (days) was 23 DB06-15 methodology in 2014. ▼ Falling
Time to export (days) in West Bank and Gaza, 2005–2014
Source: World Bank. Measured in DB06-15 methodology.
Analysis
The most recent figure for time to export (days) in West Bank and Gaza is 23 DB06-15 methodology, measured in 2014. That is the lowest value across all 10 years on record.
That represents a change of down 8.0% over ten years.
Over the whole period, time to export (days) in West Bank and Gaza peaked at 25 DB06-15 methodology in 2005 and was at its lowest, 23 DB06-15 methodology, in 2010.
West Bank and Gaza ranks 52nd of 181 countries on this measure, in the middle of the range.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 25 DB06-15 methodology | 25 DB06-15 methodology | 25 DB06-15 methodology | 5 |
| 2010s | 23 DB06-15 methodology | 23 DB06-15 methodology | 23 DB06-15 methodology | 5 |
Countries ranked near West Bank and Gaza
- 50 Namibia 24 DB06-15 methodology compare
- 50 Togo 24 DB06-15 methodology compare
- 52 Cameroon 23 DB06-15 methodology compare
- 52 Lao PDR 23 DB06-15 methodology compare
- 52 Marshall Islands 23 DB06-15 methodology compare
- 52 Moldova 23 DB06-15 methodology compare
- 52 Papua New Guinea 23 DB06-15 methodology compare
More reference data data for West Bank and Gaza
- Emission Totals - Emissions (CO2eq) from N2O (AR5) - Manure left on Pa 169.14 (2050)
- Emission Totals - Emissions (N2O) - IPCC Agriculture 0.7088 (2050)
- Emission Totals - Emissions (N2O) - Manure left on Pasture 0.6383 (2050)
- Emission Totals - Emissions (N2O) - Manure Management 0.0127 (2050)
- Emission Totals - Emissions (CH4) - Burning - Crop residues 0.0193 (2050)
- Emission Totals - Emissions (CH4) - Enteric Fermentation 8.83 (2050)
- Emission Totals - Emissions (N2O) - Crop Residues 0.022 (2050)
- Emission Totals - Emissions (CO2eq) from N2O (AR5) - Crop Residues 5.84 (2050)
- Emission Totals - Emissions (N2O) - Burning - Crop residues 0.0005 (2050)
- Emission Totals - Emissions (CO2eq) from N2O (AR5) - IPCC Agriculture 187.82 (2050)
Frequently asked questions
- What is time to export (days) in West Bank and Gaza?
- Time to export (days) in West Bank and Gaza was 23 DB06-15 methodology in 2014, according to the World Bank.
- What is the highest time to export (days) recorded in West Bank and Gaza?
- The highest recorded value was 25 DB06-15 methodology in 2005.
- What is the lowest time to export (days) recorded in West Bank and Gaza?
- The lowest recorded value was 23 DB06-15 methodology in 2010.
- How does West Bank and Gaza rank for time to export (days)?
- West Bank and Gaza ranks 52nd out of 181 countries with data for 2014.
- Is time to export (days) rising or falling in West Bank and Gaza?
- Over the last ten years it is down 8.0%. The long-run trend across the full record is falling.
- Where does this West Bank and Gaza data come from?
- The figures come from the World Bank, published as part of Time to export (days) (DB06-15 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 10 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time to export records the time associated with exporting a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calculated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to firms located in an export processing zone, or only to certain accredited firms under authorized economic operator programs, are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.