Time to export (days) in United States
United States: Time to export (days) was 6 DB06-15 methodology in 2014. ▬ Flat
Time to export (days) in United States, 2005–2014
Source: World Bank. Measured in DB06-15 methodology.
Analysis
The most recent figure for time to export (days) in United States is 6 DB06-15 methodology, measured in 2014. That is the highest value across all 10 years on record.
That represents a change of unchanged over ten years.
Over the whole period, time to export (days) in United States peaked at 6 DB06-15 methodology in 2005 and was at its lowest, 6 DB06-15 methodology, in 2005.
United States ranks 177th of 181 countries on this measure, in the bottom quarter.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 6 DB06-15 methodology | 6 DB06-15 methodology | 6 DB06-15 methodology | 5 |
| 2010s | 6 DB06-15 methodology | 6 DB06-15 methodology | 6 DB06-15 methodology | 5 |
Countries ranked near United States
- 174 Cyprus 7 DB06-15 methodology compare
- 174 Netherlands 7 DB06-15 methodology compare
- 174 United Arab Emirates 7 DB06-15 methodology compare
- 177 Denmark 6 DB06-15 methodology compare
- 177 Estonia 6 DB06-15 methodology compare
- 177 Hong Kong 6 DB06-15 methodology compare
- 177 Singapore 6 DB06-15 methodology compare
More reference data data for United States
- Emission Totals - Emissions (N2O) - Crop Residues 112.69 (2050)
- Emission Totals - Indirect emissions (N2O) - Manure applied to Soils 19.34 (2050)
- Emission Totals - Indirect emissions (N2O) - Crop Residues 20.7 (2050)
- Emission Totals - Emissions (N2O) - Burning - Crop residues 3.28 (2050)
- Emission Totals - Indirect emissions (N2O) - IPCC Agriculture 119.42 (2050)
- Emission Totals - Emissions (N2O) - Manure left on Pasture 133.45 (2050)
- Emission Totals - Emissions (CO2eq) from N2O (AR5) - Manure left on Pa 35,363 (2050)
- Emission Totals - Emissions (N2O) - IPCC Agriculture 589.96 (2050)
- Emission Totals - Emissions (N2O) - Manure applied to Soils 64.85 (2050)
- Emission Totals - Emissions (N2O) - Manure Management 52.14 (2050)
Frequently asked questions
- What is time to export (days) in United States?
- Time to export (days) in United States was 6 DB06-15 methodology in 2014, according to the World Bank.
- What is the highest time to export (days) recorded in United States?
- The highest recorded value was 6 DB06-15 methodology in 2005.
- What is the lowest time to export (days) recorded in United States?
- The lowest recorded value was 6 DB06-15 methodology in 2005.
- How does United States rank for time to export (days)?
- United States ranks 177th out of 181 countries with data for 2014.
- Is time to export (days) rising or falling in United States?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this United States data come from?
- The figures come from the World Bank, published as part of Time to export (days) (DB06-15 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 10 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time to export records the time associated with exporting a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calculated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to firms located in an export processing zone, or only to certain accredited firms under authorized economic operator programs, are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.