Time to export (days) in Tunisia
Tunisia: Time to export (days) was 16 DB06-15 methodology in 2014. ▼ Falling
Time to export (days) in Tunisia, 2005–2014
Source: World Bank. Measured in DB06-15 methodology.
Analysis
In 2014, time to export (days) in Tunisia stood at 16 DB06-15 methodology. That is the highest value across all 10 years on record.
The figure is up 23.1% on the previous year and unchanged over ten years.
Over the whole period, time to export (days) in Tunisia peaked at 16 DB06-15 methodology in 2005 and was at its lowest, 13 DB06-15 methodology, in 2009.
Tunisia ranks 99th of 181 countries on this measure, in the middle of the range.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 15 DB06-15 methodology | 13 DB06-15 methodology | 16 DB06-15 methodology | 5 |
| 2010s | 13.6 DB06-15 methodology | 13 DB06-15 methodology | 16 DB06-15 methodology | 5 |
Countries ranked near Tunisia
- 99 Antigua and Barbuda 16 DB06-15 methodology compare
- 99 Armenia 16 DB06-15 methodology compare
- 99 Bosnia and Herzegovina 16 DB06-15 methodology compare
- 99 Croatia 16 DB06-15 methodology compare
- 99 Seychelles 16 DB06-15 methodology compare
- 99 Slovakia 16 DB06-15 methodology compare
- 99 Slovenia 16 DB06-15 methodology compare
- 99 South Africa 16 DB06-15 methodology compare
- 99 Sri Lanka 16 DB06-15 methodology compare
More reference data data for Tunisia
- Emission Totals - Emissions (CO2eq) from N2O (AR5) - Burning - Crop re 5.29 (2050)
- Emission Totals - Emissions (CH4) - IPCC Agriculture 125.93 (2050)
- Emission Totals - Emissions (CH4) - Manure Management 6.83 (2050)
- Emission Totals - Emissions (N2O) - Manure applied to Soils 0.4961 (2050)
- Emission Totals - Emissions (N2O) - Manure left on Pasture 8.07 (2050)
- Emission Totals - Emissions (N2O) - Manure Management 0.1849 (2050)
- Emission Totals - Emissions (N2O) - Crop Residues 0.7169 (2050)
- Emission Totals - Indirect emissions (N2O) - Agricultural Soils 3.38 (2050)
- Emission Totals - Emissions (CO2eq) from N2O (AR5) - Manure Management 48.99 (2050)
- Emission Totals - Emissions (CO2eq) from N2O (AR5) - Manure left on Pa 2,139 (2050)
Frequently asked questions
- What is time to export (days) in Tunisia?
- Time to export (days) in Tunisia was 16 DB06-15 methodology in 2014, according to the World Bank.
- What is the highest time to export (days) recorded in Tunisia?
- The highest recorded value was 16 DB06-15 methodology in 2005.
- What is the lowest time to export (days) recorded in Tunisia?
- The lowest recorded value was 13 DB06-15 methodology in 2009.
- How does Tunisia rank for time to export (days)?
- Tunisia ranks 99th out of 181 countries with data for 2014.
- Is time to export (days) rising or falling in Tunisia?
- Over the last ten years it is unchanged. The long-run trend across the full record is falling.
- Where does this Tunisia data come from?
- The figures come from the World Bank, published as part of Time to export (days) (DB06-15 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 10 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time to export records the time associated with exporting a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calculated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to firms located in an export processing zone, or only to certain accredited firms under authorized economic operator programs, are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.