Time to export (days) in Nicaragua

Nicaragua: Time to export (days) was 21 DB06-15 methodology in 2014. ▼ Falling

Latest (2014)
21 DB06-15 methodology
Change on year
unchanged
World rank
67th
of 181 countries
All-time high
38 DB06-15 methodology
in 2005
All-time low
21 DB06-15 methodology
in 2012
Years of data
10
2005–2014

Time to export (days) in Nicaragua, 2005–2014

0102030402005200920142005: 38 DB06-15 methodology2006: 36 DB06-15 methodology2007: 36 DB06-15 methodology2008: 29 DB06-15 methodology2009: 29 DB06-15 methodology2010: 26 DB06-15 methodology2011: 24 DB06-15 methodology2012: 21 DB06-15 methodology2013: 21 DB06-15 methodology2014: 21 DB06-15 methodology

Source: World Bank. Measured in DB06-15 methodology.

Analysis

In 2014, time to export (days) in Nicaragua stood at 21 DB06-15 methodology. That is the lowest value across all 10 years on record.

The figure is down 44.7% over ten years.

Over the whole period, time to export (days) in Nicaragua peaked at 38 DB06-15 methodology in 2005 and was at its lowest, 21 DB06-15 methodology, in 2012.

That places Nicaragua 67th out of 181 countries with data for 2014, putting it in the middle of the range.

Averages by decade

DecadeAverage LowestHighest Years
2000s 33.6 DB06-15 methodology 29 DB06-15 methodology 38 DB06-15 methodology 5
2010s 22.6 DB06-15 methodology 21 DB06-15 methodology 26 DB06-15 methodology 5

Countries ranked near Nicaragua

  1. 66 Russia 21.1 DB06-15 methodology compare
  2. 67 China 21 DB06-15 methodology compare
  3. 67 Maldives 21 DB06-15 methodology compare
  4. 67 Mozambique 21 DB06-15 methodology compare
  5. 67 Samoa 21 DB06-15 methodology compare
  6. 67 Vanuatu 21 DB06-15 methodology compare
  7. 67 Vietnam 21 DB06-15 methodology compare

See the full ranking of 183 places →

More reference data data for Nicaragua

All data for Nicaragua →

Frequently asked questions

What is time to export (days) in Nicaragua?
Time to export (days) in Nicaragua was 21 DB06-15 methodology in 2014, according to the World Bank.
What is the highest time to export (days) recorded in Nicaragua?
The highest recorded value was 38 DB06-15 methodology in 2005.
What is the lowest time to export (days) recorded in Nicaragua?
The lowest recorded value was 21 DB06-15 methodology in 2012.
How does Nicaragua rank for time to export (days)?
Nicaragua ranks 67th out of 181 countries with data for 2014.
Is time to export (days) rising or falling in Nicaragua?
Over the last ten years it is down 44.7%. The long-run trend across the full record is falling.
Where does this Nicaragua data come from?
The figures come from the World Bank, published as part of Time to export (days) (DB06-15 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 10 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Time to export (days) (DB06-15 methodology)
Unit
DB06-15 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The time to export records the time associated with exporting a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calculated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to firms located in an export processing zone, or only to certain accredited firms under authorized economic operator programs, are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.