Time to export (days) in Hungary

Hungary: Time to export (days) was 17 DB06-15 methodology in 2014. ▲ Rising

Latest (2014)
17 DB06-15 methodology
Change on year
unchanged
World rank
92nd
of 181 countries
All-time high
17 DB06-15 methodology
in 2012
All-time low
16 DB06-15 methodology
in 2005
Years of data
10
2005–2014

Time to export (days) in Hungary, 2005–2014

0510152005200920142005: 16 DB06-15 methodology2006: 16 DB06-15 methodology2007: 16 DB06-15 methodology2008: 16 DB06-15 methodology2009: 16 DB06-15 methodology2010: 16 DB06-15 methodology2011: 16 DB06-15 methodology2012: 17 DB06-15 methodology2013: 17 DB06-15 methodology2014: 17 DB06-15 methodology

Source: World Bank. Measured in DB06-15 methodology.

Analysis

The most recent figure for time to export (days) in Hungary is 17 DB06-15 methodology, measured in 2014. That is the highest value across all 10 years on record.

Compared with earlier readings it is up 6.2% over ten years.

Over the whole period, time to export (days) in Hungary peaked at 17 DB06-15 methodology in 2012 and was at its lowest, 16 DB06-15 methodology, in 2005.

That places Hungary 92nd out of 181 countries with data for 2014, putting it in the middle of the range.

Averages by decade

DecadeAverage LowestHighest Years
2000s 16 DB06-15 methodology 16 DB06-15 methodology 16 DB06-15 methodology 5
2010s 16.6 DB06-15 methodology 16 DB06-15 methodology 17 DB06-15 methodology 5

Countries ranked near Hungary

  1. 91 India 17.06 DB06-15 methodology compare
  2. 92 Indonesia 17 DB06-15 methodology compare
  3. 92 Algeria 17 DB06-15 methodology compare
  4. 92 Belize 17 DB06-15 methodology compare
  5. 92 Czechia 17 DB06-15 methodology compare
  6. 92 Eswatini 17 DB06-15 methodology compare
  7. 92 Guatemala 17 DB06-15 methodology compare

See the full ranking of 183 places →

More reference data data for Hungary

All data for Hungary →

Frequently asked questions

What is time to export (days) in Hungary?
Time to export (days) in Hungary was 17 DB06-15 methodology in 2014, according to the World Bank.
What is the highest time to export (days) recorded in Hungary?
The highest recorded value was 17 DB06-15 methodology in 2012.
What is the lowest time to export (days) recorded in Hungary?
The lowest recorded value was 16 DB06-15 methodology in 2005.
How does Hungary rank for time to export (days)?
Hungary ranks 92nd out of 181 countries with data for 2014.
Is time to export (days) rising or falling in Hungary?
Over the last ten years it is up 6.2%. The long-run trend across the full record is rising.
Where does this Hungary data come from?
The figures come from the World Bank, published as part of Time to export (days) (DB06-15 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 10 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Time to export (days) (DB06-15 methodology)
Unit
DB06-15 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The time to export records the time associated with exporting a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calculated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to firms located in an export processing zone, or only to certain accredited firms under authorized economic operator programs, are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.