Time to export (days) in Haiti
Haiti: Time to export (days) was 28 DB06-15 methodology in 2014. ▼ Falling
Time to export (days) in Haiti, 2005–2014
Source: World Bank. Measured in DB06-15 methodology.
Analysis
In 2014, time to export (days) in Haiti stood at 28 DB06-15 methodology. That is the lowest value across all 10 years on record.
Compared with earlier readings it is down 15.2% on the previous year and down 36.4% over ten years.
Over the whole period, time to export (days) in Haiti peaked at 44 DB06-15 methodology in 2005 and was at its lowest, 28 DB06-15 methodology, in 2014.
That places Haiti 35th out of 181 countries with data for 2014, putting it in the top quarter.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 42 DB06-15 methodology | 35 DB06-15 methodology | 44 DB06-15 methodology | 5 |
| 2010s | 32.4 DB06-15 methodology | 28 DB06-15 methodology | 35 DB06-15 methodology | 5 |
Countries ranked near Haiti
- 34 Bangladesh 28.34 DB06-15 methodology compare
- 35 East Timor 28 DB06-15 methodology compare
- 35 Uganda 28 DB06-15 methodology compare
- 38 Azerbaijan 27 DB06-15 methodology compare
- 38 Botswana 27 DB06-15 methodology compare
More reference data data for Haiti
- Emission Totals - Emissions (CO2eq) from N2O (AR5) - Manure left on Pa 1,254 (2050)
- Emission Totals - Emissions (N2O) - Agricultural Soils 5.98 (2050)
- Emission Totals - Emissions (CO2eq) from N2O (AR5) - IPCC Agriculture 1,764 (2050)
- Emission Totals - Emissions (CO2eq) from N2O (AR5) - Manure applied to 260.69 (2050)
- Emission Totals - Emissions (CO2eq) from N2O (AR5) - Manure Management 172.84 (2050)
- Emission Totals - Emissions (CO2eq) from N2O (AR5) - Agricultural Soil 1,584 (2050)
- Emission Totals - Indirect emissions (N2O) - Agricultural Soils 1.35 (2050)
- Emission Totals - Emissions (CO2eq) from N2O (AR5) - Burning - Crop re 6.24 (2050)
- Emission Totals - Emissions (N2O) - Manure applied to Soils 0.9837 (2050)
- Emission Totals - Emissions (CO2eq) from N2O (AR5) - Crop Residues 70.04 (2050)
Frequently asked questions
- What is time to export (days) in Haiti?
- Time to export (days) in Haiti was 28 DB06-15 methodology in 2014, according to the World Bank.
- What is the highest time to export (days) recorded in Haiti?
- The highest recorded value was 44 DB06-15 methodology in 2005.
- What is the lowest time to export (days) recorded in Haiti?
- The lowest recorded value was 28 DB06-15 methodology in 2014.
- How does Haiti rank for time to export (days)?
- Haiti ranks 35th out of 181 countries with data for 2014.
- Is time to export (days) rising or falling in Haiti?
- Over the last ten years it is down 36.4%. The long-run trend across the full record is falling.
- Where does this Haiti data come from?
- The figures come from the World Bank, published as part of Time to export (days) (DB06-15 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 10 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time to export records the time associated with exporting a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calculated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to firms located in an export processing zone, or only to certain accredited firms under authorized economic operator programs, are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.