Time to export (days) in Egypt

Egypt: Time to export (days) was 12 DB06-15 methodology in 2014. ▼ Falling

Latest (2014)
12 DB06-15 methodology
Change on year
unchanged
World rank
133rd
of 181 countries
All-time high
27 DB06-15 methodology
in 2005
All-time low
12 DB06-15 methodology
in 2010
Years of data
10
2005–2014

Time to export (days) in Egypt, 2005–2014

01020302005200920142005: 27 DB06-15 methodology2006: 20 DB06-15 methodology2007: 15 DB06-15 methodology2008: 14 DB06-15 methodology2009: 14 DB06-15 methodology2010: 12 DB06-15 methodology2011: 12 DB06-15 methodology2012: 12 DB06-15 methodology2013: 12 DB06-15 methodology2014: 12 DB06-15 methodology

Source: World Bank. Measured in DB06-15 methodology.

Analysis

Egypt recorded 12 DB06-15 methodology for time to export (days) in 2014. That is the lowest value across all 10 years on record.

Compared with earlier readings it is down 55.6% over ten years.

Over the whole period, time to export (days) in Egypt peaked at 27 DB06-15 methodology in 2005 and was at its lowest, 12 DB06-15 methodology, in 2010.

Egypt ranks 133rd of 181 countries on this measure, in the middle of the range.

Averages by decade

DecadeAverage LowestHighest Years
2000s 18 DB06-15 methodology 14 DB06-15 methodology 27 DB06-15 methodology 5
2010s 12 DB06-15 methodology 12 DB06-15 methodology 12 DB06-15 methodology 5

Countries ranked near Egypt

  1. 132 Mexico 12.02 DB06-15 methodology compare
  2. 133 Argentina 12 DB06-15 methodology compare
  3. 133 Honduras 12 DB06-15 methodology compare
  4. 133 Jordan 12 DB06-15 methodology compare
  5. 133 North Macedonia 12 DB06-15 methodology compare
  6. 133 Peru 12 DB06-15 methodology compare
  7. 133 Senegal 12 DB06-15 methodology compare
  8. 133 Serbia 12 DB06-15 methodology compare
  9. 133 Saint Vincent and the Grenadines 12 DB06-15 methodology compare

See the full ranking of 183 places →

More reference data data for Egypt

All data for Egypt →

Frequently asked questions

What is time to export (days) in Egypt?
Time to export (days) in Egypt was 12 DB06-15 methodology in 2014, according to the World Bank.
What is the highest time to export (days) recorded in Egypt?
The highest recorded value was 27 DB06-15 methodology in 2005.
What is the lowest time to export (days) recorded in Egypt?
The lowest recorded value was 12 DB06-15 methodology in 2010.
How does Egypt rank for time to export (days)?
Egypt ranks 133rd out of 181 countries with data for 2014.
Is time to export (days) rising or falling in Egypt?
Over the last ten years it is down 55.6%. The long-run trend across the full record is falling.
Where does this Egypt data come from?
The figures come from the World Bank, published as part of Time to export (days) (DB06-15 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 10 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Time to export (days) (DB06-15 methodology)
Unit
DB06-15 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The time to export records the time associated with exporting a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calculated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to firms located in an export processing zone, or only to certain accredited firms under authorized economic operator programs, are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.