Time required to start business in Egypt
Egypt: Time required to start business was 12.5 in 2019. ◆ Volatile
Latest (2019)
12.5
Change on year
up 8.7%
World rank
89th
of 188 countries
All-time high
42.5
in 2003
All-time low
11.5
in 2018
Years of data
17
2003–2019
Time required to start business in Egypt, 2003–2019
Source: Our World in Data.
Analysis
Egypt recorded 12.5 for time required to start business in 2019.
Compared with earlier readings it is up 8.7% on the previous year and unchanged over ten years.
Over the whole period, time required to start business in Egypt peaked at 42.5 in 2003 and was at its lowest, 11.5, in 2018.
That places Egypt 89th out of 188 countries with data for 2019, putting it in the middle of the range.
The series is highly variable year to year, so single readings are best treated with caution.
Time required to start business in Egypt, year by year
| Year | Value | Change |
|---|---|---|
| 2003 | 42.5 | — |
| 2004 | 42.5 | +0.0% |
| 2005 | 26.5 | -37.6% |
| 2006 | 23.5 | -11.3% |
| 2007 | 17.5 | -25.5% |
| 2008 | 12.5 | -28.6% |
| 2009 | 12.5 | +0.0% |
| 2010 | 12.5 | +0.0% |
| 2011 | 12.5 | +0.0% |
| 2012 | 12.5 | +0.0% |
| 2013 | 12.5 | +0.0% |
| 2014 | 12.5 | +0.0% |
| 2015 | 16.5 | +32.0% |
| 2016 | 16.5 | +0.0% |
| 2017 | 16.5 | +0.0% |
| 2018 | 11.5 | -30.3% |
| 2019 | 12.5 | +8.7% |
Egypt compared with similar countries
- Egypt's 12.5 is below the median for lower middle income countries, which is 15, 83% of the median. (47 countries reporting)
- Egypt's 12.5 is below the median for Middle East, North Africa, Afghanistan & Pakistan, which is 14, 89% of the median. (23 countries reporting)
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 25.36 | 12.5 | 42.5 | 7 |
| 2010s | 13.6 | 11.5 | 16.5 | 10 |
Countries ranked near Egypt
More reference data data for Egypt
- Emission Totals - Indirect emissions (N2O) - Manure applied to Soils 0.2851 (2050)
- Emission Totals - Indirect emissions (N2O) - Manure left on Pasture 5.23 (2050)
- Emission Totals - Indirect emissions (N2O) - IPCC Agriculture 16.05 (2050)
- Emission Totals - Indirect emissions (N2O) - Crop Residues 1.2 (2050)
- Emission Totals - Indirect emissions (N2O) - Agricultural Soils 16.05 (2050)
- Emission Totals - Emissions (N2O) - Manure applied to Soils 0.956 (2050)
- Emission Totals - Emissions (N2O) - Manure Management 0.4622 (2050)
- Emission Totals - Emissions (N2O) - Manure left on Pasture 25.55 (2050)
- Emission Totals - Emissions (N2O) - IPCC Agriculture 71.76 (2050)
- Emission Totals - Emissions (N2O) - Crop Residues 6.55 (2050)
Frequently asked questions
- What is time required to start business in Egypt?
- Time required to start business in Egypt was 12.5 in 2019, according to Our World in Data.
- What is the highest time required to start business recorded in Egypt?
- The highest recorded value was 42.5 in 2003.
- What is the lowest time required to start business recorded in Egypt?
- The lowest recorded value was 11.5 in 2018.
- How does Egypt rank for time required to start business?
- Egypt ranks 89th out of 188 countries with data for 2019.
- Is time required to start business rising or falling in Egypt?
- Over the last ten years it is unchanged. The long-run trend across the full record is volatile.
- Where does this Egypt data come from?
- The figures come from Our World in Data, published as part of Time required to start business. Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 17 observations, free to reuse under CC BY 4.0 (Our World in Data).