Enforcing contracts: Time in Saudi Arabia
Saudi Arabia: Enforcing contracts: Time was 575 days in 2019. ▼ Falling
Enforcing contracts: Time in Saudi Arabia, 2003–2019
Source: World Bank. Measured in days.
Analysis
The most recent figure for enforcing contracts: time in Saudi Arabia is 575 days, measured in 2019. That is the lowest value across all 17 years on record.
That represents a change of down 9.4% over ten years.
Over the whole period, enforcing contracts: time in Saudi Arabia peaked at 635 days in 2003 and was at its lowest, 575 days, in 2014.
That places Saudi Arabia 93rd out of 188 countries with data for 2019, putting it in the middle of the range.
The long-run direction has been consistently falling across the 17 years of available data.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 635 days | 635 days | 635 days | 7 |
| 2010s | 599 days | 575 days | 635 days | 10 |
Countries ranked near Saudi Arabia
More reference data data for Saudi Arabia
- Emission Totals - Emissions (N2O) - Agricultural Soils 10.41 (2050)
- Emission Totals - Emissions (N2O) - Crop Residues 0.9641 (2050)
- Emission Totals - Emissions (N2O) - Manure Management 0.2207 (2050)
- Emission Totals - Indirect emissions (N2O) - Manure applied to Soils 0.1847 (2050)
- Emission Totals - Emissions (N2O) - Burning - Crop residues 0.0139 (2050)
- Emission Totals - Emissions (N2O) - Manure left on Pasture 6.07 (2050)
- Emission Totals - Emissions (N2O) - IPCC Agriculture 10.64 (2050)
- Emission Totals - Indirect emissions (N2O) - Agricultural Soils 2.44 (2050)
- Emission Totals - Indirect emissions (N2O) - Manure left on Pasture 1.4 (2050)
- Emission Totals - Indirect emissions (N2O) - IPCC Agriculture 2.44 (2050)
Frequently asked questions
- What is enforcing contracts: time in Saudi Arabia?
- Enforcing contracts: time in Saudi Arabia was 575 days in 2019, according to the World Bank.
- What is the highest enforcing contracts: time recorded in Saudi Arabia?
- The highest recorded value was 635 days in 2003.
- What is the lowest enforcing contracts: time recorded in Saudi Arabia?
- The lowest recorded value was 575 days in 2014.
- How does Saudi Arabia rank for enforcing contracts: time?
- Saudi Arabia ranks 93rd out of 188 countries with data for 2019.
- Is enforcing contracts: time rising or falling in Saudi Arabia?
- Over the last ten years it is down 9.4%. The long-run trend across the full record is falling.
- Where does this Saudi Arabia data come from?
- The figures come from the World Bank, published as part of Enforcing contracts: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 17 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time to enforce contracts is recorded in calendar days, counted from the moment plaintiff decides to file the lawsuit in court until payment. The average duration of the following three different stages of dispute resolution is recorded: (i) filing and service, (ii) trial and judgment, and (iii) enforcement.