Romania vs Serbia: Total coal capacity by plant status (MW) - Operating
Total coal capacity by plant status (MW) - Operating over time
- Romania
- Serbia
How they compare
Romania currently reports 4,675 against 4,405 in Serbia, a difference of 270.
That makes Romania's figure about 1.1 times Serbia's.
Across all 7 years both countries report, Romania has been ahead every year.
Romania ranks 31st and Serbia ranks 32nd of 75 countries.
Romania has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Romania | Serbia | Difference | Ahead |
|---|---|---|---|---|
| 2010s | 5,685 | 4,405 | 1,280 | Romania |
| 2020s | 4,675 | 4,405 | 270 | Romania |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher total coal capacity by plant status (mw) - operating, Romania or Serbia?
- Romania, at 4,675 against 4,405 in Serbia as of 2020.
- What is the difference in total coal capacity by plant status (mw) - operating between Romania and Serbia?
- 270, with Romania ahead.
- How many years of comparable data are there for Romania and Serbia?
- 7 years are reported by both, from 2014 to 2020.
- How do Romania and Serbia rank globally for total coal capacity by plant status (mw) - operating?
- Romania ranks 31st and Serbia ranks 32nd of 75 countries.
- Where does this data come from?
- Global Coal Plant Tracker, Global Energy Monitor. Available at: https://globalenergymonitor.org/projects/global-coal-plant-tracker/, published as Total coal capacity by plant status (MW) - Operating. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Total coal capacity by plant status is generated from the Global Coal Plant Tracker (GCPT). The GCPT provides information on coal-fired power units from around the world generating 30 megawatts and above. The GCPT catalogues every operating coal-fired generating unit, every new unit proposed since 2010, and every unit retired since 2000. Units often consist of a boiler and turbine, and several units may make up one coal-fired power station. The map and underlying data is updated bi-annually, in January and July. Each plant included in the tracker is linked to a wiki page on GEM.wiki, which provides additional details. GCPT was accessed in July 2021 to generate this data.