Australia vs Vietnam: Total coal capacity by plant status (MW) - Operating
Total coal capacity by plant status (MW) - Operating over time
- Australia
- Vietnam
How they compare
Australia currently reports 25,107 against 20,317 in Vietnam, a difference of 4,790.
That makes Australia's figure about 1.2 times Vietnam's.
Across all 7 years both countries report, Australia has been ahead every year.
Australia ranks 11th and Vietnam ranks 13th of 75 countries.
Australia has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Australia | Vietnam | Difference | Ahead |
|---|---|---|---|---|
| 2010s | 26,379 | 14,756 | 11,623 | Australia |
| 2020s | 25,107 | 20,317 | 4,790 | Australia |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher total coal capacity by plant status (mw) - operating, Australia or Vietnam?
- Australia, at 25,107 against 20,317 in Vietnam as of 2020.
- What is the difference in total coal capacity by plant status (mw) - operating between Australia and Vietnam?
- 4,790, with Australia ahead.
- How many years of comparable data are there for Australia and Vietnam?
- 7 years are reported by both, from 2014 to 2020.
- How do Australia and Vietnam rank globally for total coal capacity by plant status (mw) - operating?
- Australia ranks 11th and Vietnam ranks 13th of 75 countries.
- Where does this data come from?
- Global Coal Plant Tracker, Global Energy Monitor. Available at: https://globalenergymonitor.org/projects/global-coal-plant-tracker/, published as Total coal capacity by plant status (MW) - Operating. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Total coal capacity by plant status is generated from the Global Coal Plant Tracker (GCPT). The GCPT provides information on coal-fired power units from around the world generating 30 megawatts and above. The GCPT catalogues every operating coal-fired generating unit, every new unit proposed since 2010, and every unit retired since 2000. Units often consist of a boiler and turbine, and several units may make up one coal-fired power station. The map and underlying data is updated bi-annually, in January and July. Each plant included in the tracker is linked to a wiki page on GEM.wiki, which provides additional details. GCPT was accessed in July 2021 to generate this data.