Mauritius
110
in 2020
Peru
135
in 2020
Mauritius rank
65th
Peru rank
64th

Total coal capacity by plant status (MW) - Cancelled over time

  • Mauritius
  • Peru
050100150201420172020

How they compare

Peru currently reports 135 against 110 in Mauritius, a difference of 25.

That makes Peru's figure about 1.2 times Mauritius's.

Across all 6 years both countries report, Peru has been ahead every year.

Mauritius ranks 65th and Peru ranks 64th of 65 countries.

Peru has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Mauritius Peru Difference Ahead
2010s 110 135 25 Peru
2020s 110 135 25 Peru

Averages of every year both report within each decade.

Frequently asked questions

Which has higher total coal capacity by plant status (mw) - cancelled, Mauritius or Peru?
Peru, at 135 against 110 in Mauritius as of 2020.
What is the difference in total coal capacity by plant status (mw) - cancelled between Mauritius and Peru?
25, with Peru ahead.
How many years of comparable data are there for Mauritius and Peru?
6 years are reported by both, from 2015 to 2020.
How do Mauritius and Peru rank globally for total coal capacity by plant status (mw) - cancelled?
Mauritius ranks 65th and Peru ranks 64th of 65 countries.
Where does this data come from?
Global Coal Plant Tracker, Global Energy Monitor. Available at: https://globalenergymonitor.org/projects/global-coal-plant-tracker/, published as Total coal capacity by plant status (MW) - Cancelled. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Total coal capacity by plant status (MW) - Cancelled
Source
Global Coal Plant Tracker, Global Energy Monitor. Available at: https://globalenergymonitor.org/projects/global-coal-plant-tracker/
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
65 places, 433 data points, 2014–2020
Last refreshed

Total coal capacity by plant status is generated from the Global Coal Plant Tracker (GCPT). The GCPT provides information on coal-fired power units from around the world generating 30 megawatts and above. The GCPT catalogues every operating coal-fired generating unit, every new unit proposed since 2010, and every unit retired since 2000. Units often consist of a boiler and turbine, and several units may make up one coal-fired power station. The map and underlying data is updated bi-annually, in January and July. Each plant included in the tracker is linked to a wiki page on GEM.wiki, which provides additional details. GCPT was accessed in July 2021 to generate this data.