Italy vs Jamaica: Time to import (days)

Italy
18 DB06-15 methodology
in 2014
Jamaica
17 DB06-15 methodology
in 2014
Italy rank
98th
Jamaica rank
101st

Time to import (days) over time

  • Italy
  • Jamaica
05101520200520092014

How they compare

Italy currently reports 18 DB06-15 methodology against 17 DB06-15 methodology in Jamaica, a difference of 1 DB06-15 methodology.

That makes Italy's figure about 1.1 times Jamaica's.

The two have swapped places 1 time across 10 shared years of data; in 2005 it was Jamaica ahead.

Italy ranks 98th and Jamaica ranks 101st of 181 countries.

Across the 2 decades both report, Italy averaged higher in 1 and Jamaica in 1.

Head to head by decade

Decade Italy Jamaica Difference Ahead
2000s 18 DB06-15 methodology 18.8 DB06-15 methodology 0.8 DB06-15 methodology Jamaica
2010s 18 DB06-15 methodology 17.4 DB06-15 methodology 0.6 DB06-15 methodology Italy

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time to import (days), Italy or Jamaica?
Italy, at 18 DB06-15 methodology against 17 DB06-15 methodology in Jamaica as of 2014.
What is the difference in time to import (days) between Italy and Jamaica?
1 DB06-15 methodology, with Italy ahead.
How many years of comparable data are there for Italy and Jamaica?
10 years are reported by both, from 2005 to 2014.
How do Italy and Jamaica rank globally for time to import (days)?
Italy ranks 98th and Jamaica ranks 101st of 181 countries.
Where does this data come from?
The World Bank, published as Time to import (days) (DB06-15 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Time to import (days) (DB06-15 methodology)
Unit
DB06-15 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The time to import records the time associated with importing a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calulcated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to certain accredited firms under authorized economic operator programs are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.