Iraq vs Uzbekistan: Time to import (days)

Iraq
82 DB06-15 methodology
in 2014
Uzbekistan
104 DB06-15 methodology
in 2014
Iraq rank
4th
Uzbekistan rank
1st

Time to import (days) over time

  • Iraq
  • Uzbekistan
0255075100125200520092014

How they compare

Uzbekistan currently reports 104 DB06-15 methodology against 82 DB06-15 methodology in Iraq, a difference of 22 DB06-15 methodology.

That makes Uzbekistan's figure about 1.3 times Iraq's.

Across all 10 years both countries report, Uzbekistan has been ahead every year.

Iraq ranks 4th and Uzbekistan ranks 1st of 181 countries.

Uzbekistan has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Iraq Uzbekistan Difference Ahead
2000s 101 DB06-15 methodology 114.6 DB06-15 methodology 13.6 DB06-15 methodology Uzbekistan
2010s 82.4 DB06-15 methodology 106.8 DB06-15 methodology 24.4 DB06-15 methodology Uzbekistan

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time to import (days), Iraq or Uzbekistan?
Uzbekistan, at 104 DB06-15 methodology against 82 DB06-15 methodology in Iraq as of 2014.
What is the difference in time to import (days) between Iraq and Uzbekistan?
22 DB06-15 methodology, with Uzbekistan ahead.
How many years of comparable data are there for Iraq and Uzbekistan?
10 years are reported by both, from 2005 to 2014.
How do Iraq and Uzbekistan rank globally for time to import (days)?
Iraq ranks 4th and Uzbekistan ranks 1st of 181 countries.
Where does this data come from?
The World Bank, published as Time to import (days) (DB06-15 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Time to import (days) (DB06-15 methodology)
Unit
DB06-15 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The time to import records the time associated with importing a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calulcated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to certain accredited firms under authorized economic operator programs are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.