Egypt, Arab Rep. vs Serbia: Time to import (days)

Egypt, Arab Rep.
15 DB06-15 methodology
in 2014
Serbia
15 DB06-15 methodology
in 2014
Egypt, Arab Rep. rank
112th
Serbia rank
112th

Time to import (days) over time

  • Egypt, Arab Rep.
  • Serbia
1020304050200520092014

How they compare

Egypt, Arab Rep. currently reports 15 DB06-15 methodology against 15 DB06-15 methodology in Serbia, a difference of 0 DB06-15 methodology.

The two have swapped places 2 times across 10 shared years of data; in 2005 it was Serbia ahead.

Egypt, Arab Rep. ranks 112th and Serbia ranks 112th of 181 countries.

Across the 2 decades both report, Egypt, Arab Rep. averaged higher in 1 and Serbia in 1.

Head to head by decade

Decade Egypt, Arab Rep. Serbia Difference Ahead
2000s 23.4 DB06-15 methodology 22 DB06-15 methodology 1.4 DB06-15 methodology Egypt, Arab Rep.
2010s 15 DB06-15 methodology 15.6 DB06-15 methodology 0.6 DB06-15 methodology Serbia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time to import (days), Egypt, Arab Rep. or Serbia?
Egypt, Arab Rep., at 15 DB06-15 methodology against 15 DB06-15 methodology in Serbia as of 2014.
What is the difference in time to import (days) between Egypt, Arab Rep. and Serbia?
0 DB06-15 methodology, with Egypt, Arab Rep. ahead.
How many years of comparable data are there for Egypt, Arab Rep. and Serbia?
10 years are reported by both, from 2005 to 2014.
How do Egypt, Arab Rep. and Serbia rank globally for time to import (days)?
Egypt, Arab Rep. ranks 112th and Serbia ranks 112th of 181 countries.
Where does this data come from?
The World Bank, published as Time to import (days) (DB06-15 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Time to import (days) (DB06-15 methodology)
Unit
DB06-15 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The time to import records the time associated with importing a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calulcated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to certain accredited firms under authorized economic operator programs are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.