Egypt vs Kosovo (UNSCR 1244): Time to import (days)
Time to import (days) over time
- Egypt
- Kosovo (UNSCR 1244)
How they compare
Egypt currently reports 15 DB06-15 methodology against 15 DB06-15 methodology in Kosovo (UNSCR 1244), a difference of 0 DB06-15 methodology.
The two have swapped places 1 time across 6 shared years of data; in 2009 it was Egypt ahead.
Egypt ranks 113th and Kosovo (UNSCR 1244) ranks 113th of 184 countries.
Across the 2 decades both report, Egypt averaged higher in 1 and Kosovo (UNSCR 1244) in 1.
Head to head by decade
| Decade | Egypt | Kosovo (UNSCR 1244) | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 18 DB06-15 methodology | 16 DB06-15 methodology | 2 DB06-15 methodology | Egypt |
| 2010s | 15 DB06-15 methodology | 15.4 DB06-15 methodology | 0.4 DB06-15 methodology | Kosovo (UNSCR 1244) |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time to import (days), Egypt or Kosovo (UNSCR 1244)?
- Egypt, at 15 DB06-15 methodology against 15 DB06-15 methodology in Kosovo (UNSCR 1244) as of 2014.
- What is the difference in time to import (days) between Egypt and Kosovo (UNSCR 1244)?
- 0 DB06-15 methodology, with Egypt ahead.
- How many years of comparable data are there for Egypt and Kosovo (UNSCR 1244)?
- 6 years are reported by both, from 2009 to 2014.
- How do Egypt and Kosovo (UNSCR 1244) rank globally for time to import (days)?
- Egypt ranks 113th and Kosovo (UNSCR 1244) ranks 113th of 184 countries.
- Where does this data come from?
- The World Bank, published as Time to import (days) (DB06-15 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time to import records the time associated with importing a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calulcated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to certain accredited firms under authorized economic operator programs are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.