Czechia vs Peru: Time to import (days)

Czechia
17 DB06-15 methodology
in 2014
Peru
17 DB06-15 methodology
in 2014
Czechia rank
101st
Peru rank
101st

Time to import (days) over time

  • Czechia
  • Peru
0102030200520092014

How they compare

Czechia currently reports 17 DB06-15 methodology against 17 DB06-15 methodology in Peru, a difference of 0 DB06-15 methodology.

The two have swapped places 2 times across 10 shared years of data; in 2005 it was Peru ahead.

Czechia ranks 101st and Peru ranks 101st of 181 countries.

Across the 2 decades both report, Czechia averaged higher in 1 and Peru in 1.

Head to head by decade

Decade Czechia Peru Difference Ahead
2000s 18.8 DB06-15 methodology 27.2 DB06-15 methodology 8.4 DB06-15 methodology Peru
2010s 18.2 DB06-15 methodology 17 DB06-15 methodology 1.2 DB06-15 methodology Czechia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time to import (days), Czechia or Peru?
Czechia, at 17 DB06-15 methodology against 17 DB06-15 methodology in Peru as of 2014.
What is the difference in time to import (days) between Czechia and Peru?
0 DB06-15 methodology, with Czechia ahead.
How many years of comparable data are there for Czechia and Peru?
10 years are reported by both, from 2005 to 2014.
How do Czechia and Peru rank globally for time to import (days)?
Czechia ranks 101st and Peru ranks 101st of 181 countries.
Where does this data come from?
The World Bank, published as Time to import (days) (DB06-15 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Time to import (days) (DB06-15 methodology)
Unit
DB06-15 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The time to import records the time associated with importing a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calulcated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to certain accredited firms under authorized economic operator programs are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.