Cyprus vs Estonia: Time to import (days)

Cyprus
5 DB06-15 methodology
in 2014
Estonia
5 DB06-15 methodology
in 2014
Cyprus rank
177th
Estonia rank
177th

Time to import (days) over time

  • Cyprus
  • Estonia
012345200520092014

How they compare

Cyprus currently reports 5 DB06-15 methodology against 5 DB06-15 methodology in Estonia, a difference of 0 DB06-15 methodology.

Across all 7 years both countries report, Estonia has been ahead every year.

Cyprus ranks 177th and Estonia ranks 177th of 181 countries.

Head to head by decade

Decade Cyprus Estonia Difference Ahead
2000s 5 DB06-15 methodology 5 DB06-15 methodology 0 DB06-15 methodology β€”
2010s 5 DB06-15 methodology 5 DB06-15 methodology 0 DB06-15 methodology β€”

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time to import (days), Cyprus or Estonia?
Cyprus, at 5 DB06-15 methodology against 5 DB06-15 methodology in Estonia as of 2014.
What is the difference in time to import (days) between Cyprus and Estonia?
0 DB06-15 methodology, with Cyprus ahead.
How many years of comparable data are there for Cyprus and Estonia?
7 years are reported by both, from 2008 to 2014.
How do Cyprus and Estonia rank globally for time to import (days)?
Cyprus ranks 177th and Estonia ranks 177th of 181 countries.
Where does this data come from?
The World Bank, published as Time to import (days) (DB06-15 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Time to import (days) (DB06-15 methodology)
Unit
DB06-15 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The time to import records the time associated with importing a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calulcated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to certain accredited firms under authorized economic operator programs are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.