Cape Verde vs Namibia: Time to import (days)

Cape Verde
20 DB06-15 methodology
in 2014
Namibia
20 DB06-15 methodology
in 2014
Cape Verde rank
86th
Namibia rank
86th

Time to import (days) over time

  • Cape Verde
  • Namibia
05101520200520092014

How they compare

Cape Verde currently reports 20 DB06-15 methodology against 20 DB06-15 methodology in Namibia, a difference of 0 DB06-15 methodology.

The two have swapped places 1 time across 10 shared years of data; in 2005 it was Cape Verde ahead.

Cape Verde ranks 86th and Namibia ranks 86th of 181 countries.

Across the 2 decades both report, Cape Verde averaged higher in 1 and Namibia in 1.

Head to head by decade

Decade Cape Verde Namibia Difference Ahead
2000s 20.2 DB06-15 methodology 20 DB06-15 methodology 0.2 DB06-15 methodology Cape Verde
2010s 18.4 DB06-15 methodology 20 DB06-15 methodology 1.6 DB06-15 methodology Namibia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time to import (days), Cape Verde or Namibia?
Cape Verde, at 20 DB06-15 methodology against 20 DB06-15 methodology in Namibia as of 2014.
What is the difference in time to import (days) between Cape Verde and Namibia?
0 DB06-15 methodology, with Cape Verde ahead.
How many years of comparable data are there for Cape Verde and Namibia?
10 years are reported by both, from 2005 to 2014.
How do Cape Verde and Namibia rank globally for time to import (days)?
Cape Verde ranks 86th and Namibia ranks 86th of 181 countries.
Where does this data come from?
The World Bank, published as Time to import (days) (DB06-15 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Time to import (days) (DB06-15 methodology)
Unit
DB06-15 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The time to import records the time associated with importing a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calulcated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to certain accredited firms under authorized economic operator programs are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.