Burundi vs Mongolia: Time to import (days)

Burundi
43 DB06-15 methodology
in 2014
Mongolia
45 DB06-15 methodology
in 2014
Burundi rank
21st
Mongolia rank
18th

Time to import (days) over time

  • Burundi
  • Mongolia
020406080200520092014

How they compare

Mongolia currently reports 45 DB06-15 methodology against 43 DB06-15 methodology in Burundi, a difference of 2 DB06-15 methodology.

The two have swapped places 1 time across 10 shared years of data; in 2005 it was Burundi ahead.

Burundi ranks 21st and Mongolia ranks 18th of 181 countries.

Burundi has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Burundi Mongolia Difference Ahead
2000s 68.8 DB06-15 methodology 43.6 DB06-15 methodology 25.2 DB06-15 methodology Burundi
2010s 49.8 DB06-15 methodology 43.8 DB06-15 methodology 6 DB06-15 methodology Burundi

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time to import (days), Burundi or Mongolia?
Mongolia, at 45 DB06-15 methodology against 43 DB06-15 methodology in Burundi as of 2014.
What is the difference in time to import (days) between Burundi and Mongolia?
2 DB06-15 methodology, with Mongolia ahead.
How many years of comparable data are there for Burundi and Mongolia?
10 years are reported by both, from 2005 to 2014.
How do Burundi and Mongolia rank globally for time to import (days)?
Burundi ranks 21st and Mongolia ranks 18th of 181 countries.
Where does this data come from?
The World Bank, published as Time to import (days) (DB06-15 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Time to import (days) (DB06-15 methodology)
Unit
DB06-15 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The time to import records the time associated with importing a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calulcated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to certain accredited firms under authorized economic operator programs are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.