Brunei vs Jordan: Time to import (days)

Brunei
15 DB06-15 methodology
in 2014
Jordan
15 DB06-15 methodology
in 2014
Brunei rank
112th
Jordan rank
112th

Time to import (days) over time

  • Brunei
  • Jordan
0102030200520092014

How they compare

Brunei currently reports 15 DB06-15 methodology against 15 DB06-15 methodology in Jordan, a difference of 0 DB06-15 methodology.

The two have swapped places 2 times across 9 shared years of data; in 2006 it was Jordan ahead.

Brunei ranks 112th and Jordan ranks 112th of 181 countries.

Across the 2 decades both report, Brunei averaged higher in 1 and Jordan in 1.

Head to head by decade

Decade Brunei Jordan Difference Ahead
2000s 19 DB06-15 methodology 21.25 DB06-15 methodology 2.25 DB06-15 methodology Jordan
2010s 16 DB06-15 methodology 15.6 DB06-15 methodology 0.4 DB06-15 methodology Brunei

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time to import (days), Brunei or Jordan?
Brunei, at 15 DB06-15 methodology against 15 DB06-15 methodology in Jordan as of 2014.
What is the difference in time to import (days) between Brunei and Jordan?
0 DB06-15 methodology, with Brunei ahead.
How many years of comparable data are there for Brunei and Jordan?
9 years are reported by both, from 2006 to 2014.
How do Brunei and Jordan rank globally for time to import (days)?
Brunei ranks 112th and Jordan ranks 112th of 181 countries.
Where does this data come from?
The World Bank, published as Time to import (days) (DB06-15 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Time to import (days) (DB06-15 methodology)
Unit
DB06-15 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The time to import records the time associated with importing a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calulcated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to certain accredited firms under authorized economic operator programs are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.