Brunei Darussalam vs Egypt, Arab Rep.: Time to import (days)
Time to import (days) over time
- Brunei Darussalam
- Egypt, Arab Rep.
How they compare
Brunei Darussalam currently reports 15 DB06-15 methodology against 15 DB06-15 methodology in Egypt, Arab Rep., a difference of 0 DB06-15 methodology.
The two have swapped places 2 times across 9 shared years of data; in 2006 it was Egypt, Arab Rep. ahead.
Brunei Darussalam ranks 112th and Egypt, Arab Rep. ranks 112th of 181 countries.
Across the 2 decades both report, Brunei Darussalam averaged higher in 1 and Egypt, Arab Rep. in 1.
Head to head by decade
| Decade | Brunei Darussalam | Egypt, Arab Rep. | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 19 DB06-15 methodology | 21.25 DB06-15 methodology | 2.25 DB06-15 methodology | Egypt, Arab Rep. |
| 2010s | 16 DB06-15 methodology | 15 DB06-15 methodology | 1 DB06-15 methodology | Brunei Darussalam |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time to import (days), Brunei Darussalam or Egypt, Arab Rep.?
- Brunei Darussalam, at 15 DB06-15 methodology against 15 DB06-15 methodology in Egypt, Arab Rep. as of 2014.
- What is the difference in time to import (days) between Brunei Darussalam and Egypt, Arab Rep.?
- 0 DB06-15 methodology, with Brunei Darussalam ahead.
- How many years of comparable data are there for Brunei Darussalam and Egypt, Arab Rep.?
- 9 years are reported by both, from 2006 to 2014.
- How do Brunei Darussalam and Egypt, Arab Rep. rank globally for time to import (days)?
- Brunei Darussalam ranks 112th and Egypt, Arab Rep. ranks 112th of 181 countries.
- Where does this data come from?
- The World Bank, published as Time to import (days) (DB06-15 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time to import records the time associated with importing a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calulcated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to certain accredited firms under authorized economic operator programs are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.