Bahrain vs Brunei: Time to import (days)

Bahrain
15 DB06-15 methodology
in 2014
Brunei
15 DB06-15 methodology
in 2014
Bahrain rank
112th
Brunei rank
112th

Time to import (days) over time

  • Bahrain
  • Brunei
05101520200620102014

How they compare

Bahrain currently reports 15 DB06-15 methodology against 15 DB06-15 methodology in Brunei, a difference of 0 DB06-15 methodology.

Across all 8 years both countries report, Brunei has been ahead every year.

Bahrain ranks 112th and Brunei ranks 112th of 181 countries.

Brunei has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Bahrain Brunei Difference Ahead
2000s 15 DB06-15 methodology 19 DB06-15 methodology 4 DB06-15 methodology Brunei
2010s 15 DB06-15 methodology 16 DB06-15 methodology 1 DB06-15 methodology Brunei

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time to import (days), Bahrain or Brunei?
Bahrain, at 15 DB06-15 methodology against 15 DB06-15 methodology in Brunei as of 2014.
What is the difference in time to import (days) between Bahrain and Brunei?
0 DB06-15 methodology, with Bahrain ahead.
How many years of comparable data are there for Bahrain and Brunei?
8 years are reported by both, from 2007 to 2014.
How do Bahrain and Brunei rank globally for time to import (days)?
Bahrain ranks 112th and Brunei ranks 112th of 181 countries.
Where does this data come from?
The World Bank, published as Time to import (days) (DB06-15 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Time to import (days) (DB06-15 methodology)
Unit
DB06-15 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The time to import records the time associated with importing a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calulcated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to certain accredited firms under authorized economic operator programs are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.