Austria vs Grenada: Time to import (days)

Austria
9 DB06-15 methodology
in 2014
Grenada
9 DB06-15 methodology
in 2014
Austria rank
153rd
Grenada rank
153rd

Time to import (days) over time

  • Austria
  • Grenada
0510152025200520092014

How they compare

Austria currently reports 9 DB06-15 methodology against 9 DB06-15 methodology in Grenada, a difference of 0 DB06-15 methodology.

Across all 10 years both countries report, Grenada has been ahead every year.

Austria ranks 153rd and Grenada ranks 153rd of 181 countries.

Grenada has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Austria Grenada Difference Ahead
2000s 9.4 DB06-15 methodology 21 DB06-15 methodology 11.6 DB06-15 methodology Grenada
2010s 9 DB06-15 methodology 10.2 DB06-15 methodology 1.2 DB06-15 methodology Grenada

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time to import (days), Austria or Grenada?
Austria, at 9 DB06-15 methodology against 9 DB06-15 methodology in Grenada as of 2014.
What is the difference in time to import (days) between Austria and Grenada?
0 DB06-15 methodology, with Austria ahead.
How many years of comparable data are there for Austria and Grenada?
10 years are reported by both, from 2005 to 2014.
How do Austria and Grenada rank globally for time to import (days)?
Austria ranks 153rd and Grenada ranks 153rd of 181 countries.
Where does this data come from?
The World Bank, published as Time to import (days) (DB06-15 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Time to import (days) (DB06-15 methodology)
Unit
DB06-15 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The time to import records the time associated with importing a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calulcated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to certain accredited firms under authorized economic operator programs are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.