Niger vs Tajikistan: Time to export (days)

Niger
56 DB06-15 methodology
in 2014
Tajikistan
71 DB06-15 methodology
in 2014
Niger rank
7th
Tajikistan rank
4th

Time to export (days) over time

  • Niger
  • Tajikistan
020406080200520092014

How they compare

Tajikistan currently reports 71 DB06-15 methodology against 56 DB06-15 methodology in Niger, a difference of 15 DB06-15 methodology.

That makes Tajikistan's figure about 1.3 times Niger's.

Across all 10 years both countries report, Tajikistan has been ahead every year.

Niger ranks 7th and Tajikistan ranks 4th of 181 countries.

Tajikistan has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Niger Tajikistan Difference Ahead
2000s 59 DB06-15 methodology 71 DB06-15 methodology 12 DB06-15 methodology Tajikistan
2010s 58 DB06-15 methodology 71 DB06-15 methodology 13 DB06-15 methodology Tajikistan

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time to export (days), Niger or Tajikistan?
Tajikistan, at 71 DB06-15 methodology against 56 DB06-15 methodology in Niger as of 2014.
What is the difference in time to export (days) between Niger and Tajikistan?
15 DB06-15 methodology, with Tajikistan ahead.
How many years of comparable data are there for Niger and Tajikistan?
10 years are reported by both, from 2005 to 2014.
How do Niger and Tajikistan rank globally for time to export (days)?
Niger ranks 7th and Tajikistan ranks 4th of 181 countries.
Where does this data come from?
The World Bank, published as Time to export (days) (DB06-15 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Time to export (days) (DB06-15 methodology)
Unit
DB06-15 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The time to export records the time associated with exporting a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calculated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to firms located in an export processing zone, or only to certain accredited firms under authorized economic operator programs, are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.