Guinea vs Sudan: Time to export (days)

Guinea
36 DB06-15 methodology
in 2014
Sudan
32 DB06-15 methodology
in 2014
Guinea rank
22nd
Sudan rank
24th

Time to export (days) over time

  • Guinea
  • Sudan
0204060200520092014

How they compare

Guinea currently reports 36 DB06-15 methodology against 32 DB06-15 methodology in Sudan, a difference of 4 DB06-15 methodology.

That makes Guinea's figure about 1.1 times Sudan's.

The two have swapped places 1 time across 10 shared years of data; in 2005 it was Sudan ahead.

Guinea ranks 22nd and Sudan ranks 24th of 181 countries.

Across the 2 decades both report, Guinea averaged higher in 1 and Sudan in 1.

Head to head by decade

Decade Guinea Sudan Difference Ahead
2000s 34 DB06-15 methodology 43.6 DB06-15 methodology 9.6 DB06-15 methodology Sudan
2010s 36 DB06-15 methodology 32 DB06-15 methodology 4 DB06-15 methodology Guinea

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time to export (days), Guinea or Sudan?
Guinea, at 36 DB06-15 methodology against 32 DB06-15 methodology in Sudan as of 2014.
What is the difference in time to export (days) between Guinea and Sudan?
4 DB06-15 methodology, with Guinea ahead.
How many years of comparable data are there for Guinea and Sudan?
10 years are reported by both, from 2005 to 2014.
How do Guinea and Sudan rank globally for time to export (days)?
Guinea ranks 22nd and Sudan ranks 24th of 181 countries.
Where does this data come from?
The World Bank, published as Time to export (days) (DB06-15 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Time to export (days) (DB06-15 methodology)
Unit
DB06-15 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The time to export records the time associated with exporting a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calculated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to firms located in an export processing zone, or only to certain accredited firms under authorized economic operator programs, are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.