Fiji vs Italy: Time to export (days)

Fiji
19 DB06-15 methodology
in 2014
Italy
19 DB06-15 methodology
in 2014
Fiji rank
79th
Italy rank
79th

Time to export (days) over time

  • Fiji
  • Italy
0510152025200520092014

How they compare

Fiji currently reports 19 DB06-15 methodology against 19 DB06-15 methodology in Italy, a difference of 0 DB06-15 methodology.

The two have swapped places 1 time across 10 shared years of data; in 2005 it was Fiji ahead.

Fiji ranks 79th and Italy ranks 79th of 181 countries.

Across the 2 decades both report, Fiji averaged higher in 1 and Italy in 1.

Head to head by decade

Decade Fiji Italy Difference Ahead
2000s 22.6 DB06-15 methodology 20 DB06-15 methodology 2.6 DB06-15 methodology Fiji
2010s 19 DB06-15 methodology 19.6 DB06-15 methodology 0.6 DB06-15 methodology Italy

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time to export (days), Fiji or Italy?
Fiji, at 19 DB06-15 methodology against 19 DB06-15 methodology in Italy as of 2014.
What is the difference in time to export (days) between Fiji and Italy?
0 DB06-15 methodology, with Fiji ahead.
How many years of comparable data are there for Fiji and Italy?
10 years are reported by both, from 2005 to 2014.
How do Fiji and Italy rank globally for time to export (days)?
Fiji ranks 79th and Italy ranks 79th of 181 countries.
Where does this data come from?
The World Bank, published as Time to export (days) (DB06-15 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Time to export (days) (DB06-15 methodology)
Unit
DB06-15 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The time to export records the time associated with exporting a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calculated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to firms located in an export processing zone, or only to certain accredited firms under authorized economic operator programs, are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.